Laserfiche WebLink
0""+ -AP Town of Mas pee <br /> 16 Great Neck Roach North <br /> Mashee, Massachusetts 02649 <br /> BOARD of HEALTH - PUBLIC SESSION <br /> Minutes of the Meeting of December 19, 2012 <br /> Boars! Members Present: Also Present: <br /> Burton Kaplan, Chairman 'Glen Harrington, Health Agent <br /> Kalliope Egloff, Co-Chairman <br /> Luer Burton, Clerk <br /> 5 <br /> Chairman Burton Kaplan called the meeting to order at 7:00 PI I.- <br /> APPOINTI1 El TS <br /> 7:15 PM — Margaret Baker—o & M Violation — 50 Canonchet Avenue. <br /> Burton Caplan stated there is no need for a hearing. The owners of 50 Canon het Avenue are now in <br /> compliance. <br /> Glen Harrington commented that the Board of Health has received all of the information than was <br /> req uested. <br /> 7:25 PM — Stuart Bornstein —o & I I Violation — Bay Point Condominiums. <br /> Burton Kaplan commented that Stuart Bornstein submitted a letter stating that only four units are <br /> occupied at Baer Point Condominiums. <br /> Glen Harrington suggested the following: <br /> 1. Allow a maintenance worker to check the system annually or to have a full inspection <br /> annually. <br /> 2. Extend the start-up period until % occupancy, then require 100 compliance with <br /> Piloting Approval. <br /> Kalliope E loff stated that a full inspection annually would be reasonable in order to.be certain that <br /> the system is operating properly, especially with a low intake of eater. <br /> Nor. Caplan suggested that Glen Harrington contact Holmes & McGrath and get their comments on <br /> the lover intake of grater. <br /> Calliope Bloff rude a motion that the Board of Health require annual-testing by a qualified <br /> wastewater treatment operator pending any information offered by Holmes and McGrath. Lucy <br /> Burton seconded the motion. The motion was unanimously approved. <br /> 7:35 Pill —Thomas & ,loan Analett — Show Cause Hearin — 52 Quaker Run load. <br /> Burton Caplan stated than a certified letter was seat to Thomas and .loan Analetto to prepare septic <br /> plans within 14 dams from receipt of the certified letter. Another requirement was to pump the tank <br /> within 24 hogs from receipt of the letter. No physical evidence of pumping was provided. The last <br /> requirement was to obtain the services of a Mashpee licensed septic installer to install the system <br /> within 45 days of plan approval. <br />