My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/10/2003 LIBRARY BUILDING COMMITTEE Minutes
>
6/10/2003 LIBRARY BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 5:09:30 PM
Creation date
4/9/2018 3:18:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
LIBRARY BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/10/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'i TOWN OF,MASHPEE- : <br /> LIB <br /> COMMITTEE <br /> Minutes from the Meeting of 6110/03 <br /> committee Attendees: Also Attending: <br /> _ <br /> --Kevin Connoiiy- - Joyce-11 a on <br /> Grace Talmage John.l en <br /> Ed DFo <br /> Diana Lannon . <br /> Maureen Rounds <br /> Sheldon Gilbert <br /> Chairman Sevin brinollr called the meeting to order at 7- <br /> .10 PM. As ty re was nouoruim res <br /> ent, the <br /> committee dispersed with review/approval of minutes from two previous meet* <br /> Kevin voiced the concern of the entire committee over the drd hitedts'estimated cost of000-0 <br /> 7 fors <br /> construction of a new libr ry for the Town of Mashpee. This a ount is roughly$3,000,000' over the amount <br /> initially approved by the Town. Kevin posed the questfdn to Joyde Mason-- "Where' ' 'do' we.go from here' tt <br /> 4o ce reported that the Million-estimated cost for a 'new library had caused somerumblin at Town Flail. <br /> First of all, it would have to be approved by � Tdvwrn Grote. Second, a far as fitting into the Town debt schedule <br /> -of today, a $ Million project would #lave to be moved out two to three years befdre ever.being considered. <br /> Temporary bonding would not occur until 20071,with permanent bonding not ha pening'-dntil 2009. <br /> ;Joyce as ked.whether the comm l_ttee had tons idered paring down the project: erha b con • <br /> J p p. g Just the <br /> rnaih section of the prd new structure, eliminating the rrretin g room and children's Win g for thep res'ent <br /> time. Kevin stated that this option had been discussed, but noted'that it:does not sage a significant amountt`and <br /> stilleaves substantial mount of money that would need to be raised by the committee through fundraisin <br /> activities.-Ars , the question was raised as to the wisdorrr..of going forward'With construction' of a new' library half <br /> the size necessary to meet the existing.needs of the community. Heiene.i eFoe' will need to be involved in <br /> discussions.regarding what carp, ;and what cannot, be sacrificed for.the'n w library. <br /> Joyce recommended that we're nest an audience before the Board of Selectmen to discuss with them4-- <br /> the <br /> situation, to gee if they are willing to change their-brig in i figgre of$ -M' illi No-a higher n' umber. Joyce wrill <br /> provide the debt schedul information to the Selectmen. -Currently# Mashpee is looking at n $800,000 shortfall. <br /> After ctober, it will be known what the State is going to do. The Tow n dies.have a.reerve fund, but it is not <br /> •available for use to fund torn budding projects. <br /> Joyce further stated that'she feels it is not feasible to hold -off ah the.11 brary profec't for four years. Rath er, s <br /> .recommends Chart the committee do its utmost to gage the project down without-shrinking it-to air unaccepta�bl <br /> e�_ <br /> size,'bring'the new-library building project plans in line with what is-appropriate-for the Town-of Ilashpee, _ <br /> present it to the hoard of Selectmen and see what direction th y fel' a should go. <br /> 'NEXT STEPS <br /> 1. lye will provide infor,anion.to the committee ori-tax irnpIications of don tructin a new' llbra <br /> g r <br /> . J hn Fen z will contact J. Stewart Rob to request that he work on paring down the cost timate for, <br /> ,; <br /> the library'project as much as rs'feasibiy possible'. <br /> Join Renzwill ask Mr. Roberts to'have a new, lower estimate prepared in time for the next.Board of <br /> S lector'ants meeting on July 7th.. <br /> . John.will ask Mr. Roberts to attend the,July 7'h.Selectmen's meeting to be available to answer their <br /> questions and to share his knowledge aend a perti n the library project, based upon his.past <br /> experience with many other library building projects. <br /> . The committee Will cdr't ct Joyce Mason no later than July 1 to.confirm Mr; Y <br /> Roberts'avaifabiiit to <br /> attend the July 7 'Selectmen's meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.