My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/13/2000 SCHOOL COMMITTEE Minutes
>
09/13/2000 SCHOOL COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 5:06:19 PM
Creation date
4/13/2018 2:32:25 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE SCHOOL M1 ITT - REGULAR MEETING — SEPTEMBER 13, 2000 PAGE 4 <br /> Opening g 'ch ola <br /> For the most part, opening day rare smoothly at each <br /> building; teachers were pleased with them- classrooms; the <br /> cafeterias had adequate space and seating according to <br /> the custodians or principals; the building mechanical <br /> al <br /> systems were in good condition and the buildings were <br /> clean. <br /> An area of concern is the Coombs School parking lot <br /> which currently leads itself to confusion and congestion <br /> with busses and oars. Mr. Cook suggests hiring a design <br /> service to improve the parking areas and sidewalks that <br /> would include additional parking, separate entrances for <br /> buses and general parting and a designated area for <br /> parents to pick up or drop off their children. <br /> ,Cleaning: <br /> The custodial staff worked throughout the Labor Day <br /> weekend in order to get the buildings ready for the first <br /> day of school. Everything was accomplished in a timely <br /> fashion and the buildings look great. <br /> The now cafeteria tables arrived. at the Quashnet Schools <br /> and will be assembled before school starts. New custodial <br /> assignments will include regular scrubbing and <br /> burnishing ofall common areas. <br /> Maintenance/ante Grounds- <br /> The <br /> ro nds`1'h maintenance staff completed the painting of the new <br /> Superintendent's office at the Quashnet School. They also <br /> restored the corridor floor back to normal after the <br /> plumber finished connecting the bathroom drain line. <br /> A kiln that was moved from the Quashnet School to the <br /> High School arts room has been connected and is ready <br /> for usage. <br /> The athletic fields are ready for play and the coaches are <br /> pleased with their condition. <br /> Nein Office for the Superintendent. <br /> Due to complications with modifying the HVAC system, <br /> the move in date for the new office is September 25th. <br /> Coombs School principal Mr. Doyle will have an update on <br /> the Coombs School playground at the September 201h <br /> meeting. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.