Laserfiche WebLink
r <br /> r <br /> MASHPEE SCHOOL COMMITTEE - REGULAR MEETING - OCTOBER I I, 2000 FADE <br /> Coombs school Rooftop Units: <br /> The rooftop units are expected to be delivered for <br /> installation in eight weeks. The one-day crane <br /> work will be done when school is not in session. <br /> Any fabrication or field work to adapt the new <br /> units to the building will be done prior to the units <br /> arriving in order to have the shortest amount of <br /> clown time. <br /> FY2001 1 Capital Projects.- <br /> Specifications <br /> r-o' t .Specifications for the high school vinyl siding <br /> have been completed. <br /> ❖ The Quashnet School dishwasher replacement <br /> bid will require design specifications for neer <br /> stainless steel tables at both ends ofthe <br /> specified new dishwasher and design <br /> specifications for stainless steel exhaust <br /> ductwork. Mr. Cook suggested that Chartwells <br /> be involved in the layout and design of the <br /> tables so they will be properly sized and <br /> oriented. <br /> New Offce of`the Superintendent* <br /> The Superintendent's office moved from the high <br /> school to the Quashnet School on September 30th. <br /> Also it was possible to move in, there are a few <br /> items that need to be completed. They are: <br /> Bathrooms (3 creeks) <br /> Entry doors and flooring weeks) <br /> • Cooling component for the HVAC system to be <br /> done during the heating season) <br /> Electrical, hese ends (1 week) <br /> • Break room area weeks) <br /> Special Education Oftce at the High School: <br /> The remainder of the special education staff` was <br /> moved into the new location at the high school. <br /> High school classroom B 104 will be reach for <br /> students on October 16th. <br /> FY2002 budget items planned for October include: <br /> • Meet with each principal to discuss and plan <br /> capital improvement requests for the buildings <br /> and grounds. <br /> Prepare and submit budget requests for the <br /> next school year. <br /> 8.4 FY2001 Budget Review - Mr. McGo n reported the <br /> business office continues to post as the conversion <br /> with the town is not reliable at times. The <br /> business office will continue to work with the <br /> training representative to get everything on-line. <br />