My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/2007 BOARD OF SELECTMEN Minutes
>
12/17/2007 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2018 5:09:48 PM
Creation date
4/18/2018 1:48:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
12/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> Board of Selectmen <br /> Minutes <br /> December 17, 2007 <br /> NEW SSSS: <br /> Change Order#1 —Great Neck Road Borah Sidewalk Extension: <br /> Change Order#1 in the amount of$4,406.55was presented to the <br /> Selectnnen for approval. The change order, relative to the Great Neck <br /> Road South sidewalk extension would support an overrun of 62 linear feet. <br /> of cedar fence and additional police detail support. <br /> The above referenced change order was deferred to obtain a more <br /> definitive east analysis. <br /> Recommendation for General Contract—Fire Station#2: <br /> Planning& Construction Committee Chair Steve Cook was in attendance <br /> to recommend the Selectmen award the general contract for the Mashpee <br /> Fire substation to Barbato Construction of Middleboro in the amount o <br /> $14121474. The bid represents both bid alternates 1 and 2 in addition to <br /> the acceptance of the filed sub--bidders. The firm has excellent references <br /> and the bid is lover than anticipated. <br /> It was noted that bid alternate#1 is for veneer plaster in lieu of taped <br /> joints on the walls, and alternate#2 is for an increase in the size of the <br /> emergency generator. <br /> Motion made by Selectman Cahalane to accept the bid from Barbato <br /> Construction in the amount of$1,412,474 for the Mashpee Fire <br /> Substation as recommended. <br /> Motion seconded by Selectman Green. <br /> VOTE: Unanimous. 4-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.