My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/5/2011 SCHOOL COMMITTEE Minutes
>
1/5/2011 SCHOOL COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2018 2:57:22 PM
Creation date
4/18/2018 2:57:12 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/05/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'4 <br /> i o <br /> Principals' Facilities Requests <br /> • Roof repairs—all buildings <br /> See CIP FYI for KCC replacement(PC-2) and QS repair(PC-4); gutter repair at <br /> MMS/MHS completed in November 2010 (see recommendation#1 of leak assessment report <br /> —page 9) <br /> • Window Replacement QS <br /> See CIP FY 13 for Window/HVAC design(PC-12) and CIP FY 14 for construction(PC-13) <br /> • Flooring replacement QS, MMS/MHS <br /> See CIP FY12-FY17 multi-year program (PC-5). FY12 includes remainder of classrooms at <br /> QS, start of classrooms at MMS/MHS. <br /> • Repair/replacement of walkways at KCC, MMS/MHS <br /> KCC replacement under review (possible summer 2011); MMS/MHS repairs as weather <br /> permits <br /> • Phased painting—all <br /> QS gym, student baths painted by Sheriff's Department over Christmas 2010 break; QS <br /> kitchen, cafeteria painted by Maintenance this week; winter.painting of hallways, bathrooms <br /> at all schools to continue during 2"d shift and senor breaks through.opal-1,,classroom <br /> repainting program resumes in summer X011 (need ptop}yallsi lim ,l'ttaEigpjr , <br /> • Replacement of stained ceiling tiles M" ' <br /> Maintenance—submit list of locations through School Dude <br /> • Assessment of electrical-system QS <br /> Completed through Capital Needs Assessment distribution s tem_dete fined to be in good <br /> condition, outlets in fair conditio Neeek_Toeattoi-o�giolilep�areas� <br /> • AC for 2"d floor classrooms MMS/MHS <br /> • Bathrooms for preschool classrooms <br /> • Handicap ramp for KCC gym <br /> Maintenance—proposed as weather permits <br /> • MMS sign affixed to building <br /> • Locker maintenance/repair MMS/MHS <br /> Maintenance—submit 1*o£Iockers needtngregai_ <br /> • Entry rugs for preschool hallway <br /> Completed <br /> nPW RPPnnnVP <br />
The URL can be used to link to this page
Your browser does not support the video tag.