My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/2/2011 SCHOOL COMMITTEE Minutes
>
5/2/2011 SCHOOL COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 5:03:29 PM
Creation date
4/20/2018 3:15:19 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL COMMITTEE
Meeting Document Type
Minutes
Meeting Date
05/02/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
unaware of or are not using the system in place to reportbuilding-related issues for prompt and <br /> satisfactory response. <br /> Conclusions/Recommendations <br /> In Griew of the findings at the time of the visit, the following recommendations are <br /> provided: <br /> 1. Implement recommendations included in the BET report. Major roof repairs/replacement <br /> HI require capital funding and planning. In the interim maintenance staff should <br /> continue to rule minor roof repairs and monitor building materials for water damage. <br /> 2. Staff should be instructed on hover to use the maintenance reporting procedure and <br /> encouraged to use It for prompt remediation of building needs e.g., active leaks, <br /> replacement of ceiling tiles). <br /> . operate all ventilation systems throughout the-building .g., gym, cafeteria, classrooms) <br /> continuously during periods of occupancy to maximize air exchange. <br /> . Remove all blockages from univents to ensure adequate airflo . <br /> . Examine HVAC unit in B-1 for proper operation, make repairs as needed. <br /> . Examine if fresh air supply can be increased/intake adjusted in areas that measured over <br /> o ppm carbon dioxide. <br /> 7. Maintenance staff should work withbuilding occupants (e.g., athletic/coaching staff t <br /> determine proper tinier operation for HVAC system. Due to occupancy ofthe <br /> gym/training/locker room areas outside of regular school hours, more coordination is <br /> needed in these areas to provide mechanical ventilation/comfort for occupants and air <br /> exchange/removal of locker room odors. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.