Laserfiche WebLink
Flnomm Budget Report Page 5 3/5/98 <br /> DEPS`REQUEST SEL RECOM FINCOM RECOM FINANCE E MMITTEE <br /> DESCRIPTION/DEPT NUMBER FC LIAISON FY99 FY99 FY99 COMMENTS <br /> Air Exchange Unit 0.00 0.00 0.00 <br /> SCHOOL SUBT TALI EPT 300/NG &SG 12,5080238.0 1116081535.00 11,8089538.0 <br /> Cape God Tech H.S. Tuition 4929527.00 492,827.00 4923827.00 <br /> CAPE COD TECH. SUET TALIDEPT 3101SG 492P527.001 <br /> 92,527.0 492,527,00 492,827.00 <br /> Engineer Sala Wqge 78,000.00 261000.00 203000.00 <br /> Engineer Professional/Tech 105000.00 10,000.00 102000.00 <br /> Enginee ring_Expen a 401500.00 82000.00 51000.00 <br /> TOWN ENGINEER SUBT TALIDEPT 411 128,500.00 41,000.00 41,000.00 <br /> D.P.W. Sala ,Wage 500,938.00 5602935.00 560,935.00 <br /> D.P.W. Exeense 3831411.00 377,058.00 3771088.0 <br /> D.P.W. Capital 0.00 0.0010.00 <br /> HIGHWAY C I STMAII T SUBT/DEPT 422/JC 944,346.00 937,990.00 937,990.00 <br /> SNOWACE CONTROL SUBT TALIDEPT 423/JC 1181570.00 1'18,570.00 116,570.00 <br /> STREET LIGHTING SUBT TALIDEPT 4/JC 40,584.00 40,884.00 40,884.00 <br /> WASTE C LUDISP SUBT TALIDEPT 4331St 8580898.00 845,780.00 HOLD <br /> SEWER SUBT TALIDEPT 449/JC V 110.00 110.001110.0W <br /> CEMETERY SALARY/WAGE/DEPT 491/NG 800.001 800.001 <br />