Laserfiche WebLink
Fire Station Building Committee <br /> Minutes 2 <br /> October 8,, 1997 <br /> GAEUMY A&CWTECIS0 <br /> Phase H would begin thereafter to modify the existing administrative <br /> wing for increased apparatus bays. Phase IH would allow for exterior <br /> site renovations. The total renovation would increase the present <br /> facility to 16,000 ware feet. <br /> Therrien indicated that all Gaffney projects are completed within <br /> %of estimate and %of construction contract. All estimating is <br /> done in-house. Consultants are selected based upon known experience <br /> and performance that is unique to each project. Firms that are principal <br /> owned are the most favored for selection. <br /> Consultants to be assigned to Mashpee's project include; <br /> Steceo Engineering Structural Engineer <br /> Applied Systems BngineeringHAC &Plumbing <br /> Building Engi <br />