My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/8/1997 FIRE STATION BUILDING COMMITTEE Minutes
>
10/8/1997 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 5:12:54 PM
Creation date
4/27/2018 1:55:32 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/08/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fire Station Building Committee <br /> Minutes 2 <br /> October 8,, 1997 <br /> GAEUMY A&CWTECIS0 <br /> Phase H would begin thereafter to modify the existing administrative <br /> wing for increased apparatus bays. Phase IH would allow for exterior <br /> site renovations. The total renovation would increase the present <br /> facility to 16,000 ware feet. <br /> Therrien indicated that all Gaffney projects are completed within <br /> %of estimate and %of construction contract. All estimating is <br /> done in-house. Consultants are selected based upon known experience <br /> and performance that is unique to each project. Firms that are principal <br /> owned are the most favored for selection. <br /> Consultants to be assigned to Mashpee's project include; <br /> Steceo Engineering Structural Engineer <br /> Applied Systems BngineeringHAC &Plumbing <br /> Building Engi <br />
The URL can be used to link to this page
Your browser does not support the video tag.