My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/10/1998 FIRE STATION BUILDING COMMITTEE Minutes
>
2/10/1998 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 5:03:11 PM
Creation date
4/27/2018 1:58:32 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/10/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> Fire Station Building Committee <br /> Minutes <br /> February 10, 1998 <br /> Present; ,dim Vaccaro, George Baker, Joyce Mason, Ir. Elizabeth Petti, <br /> Peter Thomas, Benjamin Perry, Jr., George Wezniak <br /> Guests; Tadgh Sweeney-Donham & Sweeney, Inc. <br /> Margaret Kundert - Project Architect <br /> Meeting Called to order by Chairman Vaccaro at 9:00 a.m. <br /> Town Hall, Meeting Room #1. <br /> WMTES- <br /> Thunday- 1995: <br /> Motion made by Mr. Baker to approve the minutes o <br /> Thursday,January 8, 1998 as presented. <br /> Motion seconded by Mr. tae nia . <br /> VOTE.*- Unanimous. 5-0. <br /> Mr. Vaccaro abstained, Dir, Petti absent for vote. <br /> REPORT OF THE AR!CMTFCL <br /> Margaret Kundert and Tadgh Sweeney were present to discuss the preliminary <br /> schematic design of the Fire Station construction project with members of the <br /> Fire Station Building Committee. <br /> The design was remised as a result of requests made by the staff of the <br /> Fire and Rescue Station at a recent design proposal presentation. Schematic <br /> revisions of the design were presented to the Committee for consideration. <br /> (enclosed) <br /> Early price estimations obtained from A.M.Fogarty & Associates, Inc., <br /> Cost Estimators have brought forward an estimated figure of$2,013,685 <br /> for the construction of an 18, 0 square foot building. The projected figure <br /> does not include, furniture, fixtures and equipment that is estimated to cost <br /> 170,000. (exclusive of apparatus) <br /> Non-construction costs associated with the architectural design and engineering, <br /> bidding, construction administration, clerk of the works, printing and testing, <br /> site engineering and contingencies have been estimated to cost$257,470. <br /> Total preliminary cost projection; $2--,441,155. <br />
The URL can be used to link to this page
Your browser does not support the video tag.