2 <br /> Fire Station Building Committee <br /> Minutes <br /> Wednesday, September 22, 1999 <br /> REPORT OF THE ARCHITECT: <br /> James May presented a revised Design Development cost estimate <br /> to the Committee for review reflected as Revision 3 dated <br /> September 17, 1999. <br /> Design Development cost estimates reflect a total construction cost of <br /> $1,9687009. The conceptual design estimate conforms to the Scheme of <br /> 2B; new crew quarters and adnx1ffl* tr tive space south of the existing <br /> apparatus bags and new apparatus bay. The total project cost of Scheme <br /> is$2,403,530. <br /> As a result of budgetary constraints,the size of the building was reduced. <br /> The renovation of the Fire and Rescue Station is a budget driven project. <br /> The Committee agreed that additional space would have been more <br /> desirable. The building s designed is functional, and will not comprise <br /> the program needs of the department. It is designed to meet the <br /> requirements of the department realizing that a sub-station is a future <br /> necessity. Any difficulties that arise within the renovated nation should <br /> be addressed in the construction of the satellite station. <br /> Mr. 1 May indicated that he is comfortable to move forward to complete the <br /> .Construction Documents Phase of the intended project scope. As a result <br /> of increased Design Development changes more typically than expected, <br /> the schedule is behind by approximately one month. <br /> Motion made by Mr. Thomas to approve the Design Development <br /> lopment <br /> Phase of the Mashpee Fire and Rescue Station renovation project. <br /> Motion seconded by Mr.Baker. <br /> VOTE: Unanimous. 4- . <br /> Chairman Mason will remit a memorandum to Wallace,Floyd, Associates <br /> Inc. of the Committee's action to approve the Design Development phase <br /> of the project scope. Upon approval of the Construction Documents <br /> Phase,the Bidding Phase is anticipated to be completed before <br /> December 15 1999. <br /> The Architect was directed to develop an updated project schedule through <br /> completion for the next scheduled meeting. Ten months has been <br /> allocated for construction. <br />