in of Mashpee Fire and Rescue Station
<br /> nceptual Design Estimated Construction Costs
<br />(lace, Floyd Associates, Inc.
<br /> rch 15, 1999
<br /> eme 1 A: Addition and Renovation to existing Crew Quarters and Admin. Space
<br /> New Pre-engineered Vehicle Storage Building
<br /> eme 1 B: As above, except new Apparatus Bay in lieu of Pre-engineered Building
<br /> eme 2A: New Crew Quarters and Admin Space at south of existing Apparatus Bays
<br /> (Similar cost if Scheme 1A is constructed entirely new on south side)
<br /> New Pre-engineered Vehicle Storage Building
<br /> ieme 2B: As above, except new Apparatus Bay in lieu of Pre-engineered Building
<br /> 1A 1B 2A 2B
<br /> novated Construction $465,655 $465,655
<br /> w Construction $606,094 $606,094 $1,334,358 $1,334,358
<br /> novated Apparatus Bays $152,559 $152,559 $152,559 $152,559
<br /> s-engineered Building $271,301 $271,301
<br /> w 90'Apparatus Bay $277,642 $277,642
<br /> ise Roof over Apparatus Bays $106,327 $50,000 $106,327 $50,000
<br /> hicle Maintenance Addition $106,486 $106,486
<br /> 3 Work $157,450 $153,450 $ 7,450
<br /> tal Construction Cost $1,865,872 $1,705,400 $2,128,481 968,009
<br /> ft Costs
<br /> sign Fees $261,222 $238,756 $297,987 $275,521
<br /> sign Reimbursable Expense (est.) $30,000 $30,000 $30,000 $30,000
<br /> Survey(estimate) $4,000 $4,000 $4,000 $4,000
<br /> otechnical (estimate) $6,000 $6,000 $6,000 $6,000
<br />�dinq Expenses estimate $7,500 $7,500 $7,52200
<br /> LI/ting Services (estimate) $5,000 $5,000 5,000 5, 0
<br /> E (estimate) $30,000 $30,000 $30,000 $30,000
<br /> rk estimate $75,000 $75,000 $75,000 $750000 ✓
<br /> ll
<br /> its and Fees (estimate) $2,500 $2,500 $2,500 $2,500
<br /> rdous Materials $0 $0 $0 $0
<br /> ronmental Review $0 $0 $0 $0
<br /> ora Quarters allowance $100,000 $200,000
<br /> al Estimated Soft Costs $521,222 $598,756 $457,987 $435,521
<br /> al Project Cost $2,387,094 $2,304,156 $2,586,468 $2,403,530
<br />
|