Laserfiche WebLink
tepee Fire fescue Station, 11 ashpee, MA _ 9114199 <br /> Cost Estimate <br />)MMARY- <br /> 0 S <br /> S FLOOR AREA @ 9..square feet - 183858 <br /> meta Name cost$ SF f Bldg. <br /> dliti n lterati n 75,415 4.53 5.01% <br /> structure 131,425 7.8 8.74% <br />�erstructure1233749 7.43 8.22% <br /> irs 14,705 0.88 0.98% <br /> f Finish 551314 3.32 3.88% <br />�erior Walls 92,042 8.53 8.12% <br /> ricr Windows & Doors - 87,448 5.25 5.81 <br /> rir�,I'llall 74,372 4.46 4.94°lam <br /> nor Windows Doors 539520 3.21 3.56% <br />�shes 659779 3.95 4.37°lam <br /> ialties 211910 1.32 1.46% <br /> kipment 3,590 0.21 0.23% <br /> Inishings 27,400 1.54 1.82% <br /> hveying 57,594 4.06 4.49% <br />�hanical 4273504 25.67 28.42% <br /> Ict rival 182,786. 10.97 12.15% <br /> -Total Building 1 6049559 90.32 100.00% <br /> Work/SiteWork/Site Utilities 40,48.E 2.43 <br /> b-Total Construction 1#545,039 92.75 <br />�rnium for Union Labor @ 5% 77725214.64 <br /> eral Requirements @ 8% 129,783 7.79 <br />-. lal Conditions @ 2% 351041 2.1 <br />:alantin to bid date 499 28,807 1.61 <br /> 3,Egn Contingency @ 4% 723857 4.35 <br />-ist ruct i n Conf i r enc 5% 94,324 8.88 <br /> ital construction cost 1,980,803 j 118.91 <br /> ,projects\ ostddar.)ds Page 1/1 d g Jones and partners inc <br />