Laserfiche WebLink
4; <br /> Fire Station Building Committee <br /> Minutes- <br /> ctober 2 , 2000 <br /> Present: Joyce Mason, George Baker, Dr. Elizabeth Pati, <br /> George Wezniak, Charles Stone, Sheldon Hamblin <br /> Absent. Peter Thomas <br /> Guests: Ernest Virgilio —Clerk of the Works <br /> Meeting Called to Order by Chairman Mason at 1-.05 p.m. <br /> Ma tepee Fire & Rescue Station. <br /> MINUTES: <br /> Thursdav, October 12.,,2000: <br /> Motion made by Mr. Baler to approve the minutes of <br /> Thursday, October 1 , 2000 as presented. <br /> Motion seconded by Mr. Mone. <br /> VOTE: Unanimous. <br /> Mr. tae nial , Dr. Petti abstained. <br /> PROJECT" OVERVIEW: <br /> Structural: Price quotations for the re-configuration of the roof as detailed <br /> by Standen Construction Company reflect a figure of$60,000. The <br /> architect, Wallace Floyd, is noted to be in disagreement. The original <br /> estimate for the roo 're-framing presented a cost estimate in the range of <br /> $16,000 to $20,000. It is the architect's directive to keep the project <br /> moving forward at this time. The price quotation is expected to be re- <br /> negotiated, and further clarification will be obtained from Ammann <br /> Whitney, structural engineers as to the type of matefial that is <br /> recommended in the roof design reconfiguration proposal. A report is also <br /> pending on the conceptual cost of the roof re-framing design necessitated <br /> y structural code requirements. <br /> Truss v. Conventional Frame: Itis the consensus of the Building <br /> Committee to remain with the design criteria for conventional framing as <br /> initially detailed in the design of the-building. <br />