Laserfiche WebLink
4 <br /> 2 <br /> Fire Station Building Committee <br /> Minutes <br /> t <br /> December 21, 2000 <br /> PROJECT-OVERVIEW <br /> Change order Review and Approval: <br /> Chang e order#11 - $15316.41: <br /> To furnish and install mesh on first floor slab. <br /> FDG recommends approval. <br /> Change order#2 - $781.60: <br /> To install mesh at second floor slab. <br /> WFo recommends approval. <br /> Change order#11 and#27 as depicted were not rittn in the design <br /> specifications. It is not a building code requirement, although-the <br /> installation of the mesh is deemed necessary with a 2.5" slab. It was noted <br /> that in the architect's opinion, the work is a common and standard <br /> construction practice. The work, completed by the general contractor in <br /> good faith is noted to be a dear design omission. Town Counsel will b <br /> requested to reader a legal ruling with respect to the referenced issue. <br /> Motion made by Mr.Baker to accept Change Order#11 in the <br /> amount o $1,316.41 and Changs Order# in the amount of$781.60, <br /> and earmark the issue for dispute Vith the WFG. <br /> Motion seconded by Mr. Stone. <br /> VT : Unanimous. <br /> Chan e order#34 - $505.11: <br /> To connect "tight"tank to tank alarm system. _ <br /> vFDG recommends approval. <br /> The alarm is necessary as per code requirements. <br /> The connection was not designed. <br /> The work has been completed in good faith. <br /> Motion made by Mr.Baker to approve Change Order#34 in the <br /> amount of$505.11 as presented. <br /> Motion seconded by Mr. Stone, <br /> VOTE: Urnanimous. <br />