My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/14/2001 FIRE STATION BUILDING COMMITTEE Minutes
>
11/14/2001 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 5:13:32 PM
Creation date
4/27/2018 2:49:52 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/14/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> Fire Station Building Committee <br /> Minutes <br /> November 14, 2001 <br /> Review& Aporoval of Pavment Requisitions: <br /> Cape Cod Trailer October Storage $90.00 <br /> Inman Tree Specialists - Hydroseedmg $850.00 <br /> Wallace Floyd Design Group-Reirnbursement $538.47 <br /> Motion made by Mr. Hamblin to approve the above <br /> referenced requisitions in the amount of$1,47&47 <br /> for payment. <br /> Motion seconded by Mr. Stone. <br /> VOTE: Unanimous. <br /> L Painting: AWaratus Bqy Floors/outside Perimeter - 00: <br /> Motion made by Mr. Stone to upend a sum not to <br /> exceed $300 for line painting services. <br /> Motion seconded by Mr. Weznia . <br /> VOTE: Unanimous. <br /> Personal Movers - 750: <br /> Final Move—Release of Storage Trailer <br /> Motion made by Mr. Mone to approve a sum not to <br /> exceed 750 to employ the services of Personal Movers, <br /> Motion seconded by Mr. Weznial <br /> VO TE-b Unanimous. <br /> Installation o Telephone Dines/Jacks - $400: <br /> Phase lI —Apparatus bay, storage rooms, work room <br /> A sum not to exceed $ 00 previously authorized) <br /> Motion made by Mr. Wezniak to approve a sun not <br /> to exceed $400 for the installation of telephone lines <br /> and jacks related to Phase H of the project scope. <br /> Motion seconded'by Mr. Hamblin. <br /> VOTE: Unanimous. <br />
The URL can be used to link to this page
Your browser does not support the video tag.