Laserfiche WebLink
Fire Station Building Committee <br /> Minutes <br /> February 27, 2002 <br /> Review& Approval of Change orders: <br /> Change Order#79- 750. <br /> Horizontal window blinds <br /> Note: Horizontal blinds were specified in the manual, although the <br /> number ofblinds was not specified <br /> Motion made by Mr.Baker to approve Change order#79 in the <br /> amount of$1,750.33 as referenced. <br /> Motion seconded by Mr. Hamblin. <br /> VOTE: Unanimous. <br /> Change Order 482 - $494.29; <br /> GF'1 Breakers—Apparatus Bays; Code Issue <br /> Motion made by Mr. Stone to approve.Change order#82 in the <br /> amount of$494.29-as referenced. <br /> Motion seconded by Mr. Baker. <br /> VOTE: Unanimous. <br /> Chane order# 3 - 1,1 27.97: <br /> Install separate switch—outside Work light; added work- ply ov nt <br /> Previously approved by Cottee <br /> Motion made b -Mr. Stone to approve Change order# 3 in the <br /> amount of$1,127.97 as referenced. <br /> Motion seconded by fir. Baer. <br /> VOTE: Unanimous, <br />