Laserfiche WebLink
i <br /> Ihpee Public Library <br /> P.o* Box 657 <br /> Mashpee, Ula 02649 <br /> Circulation for April 2008 was 9,762 items. YTD is 110,713. FY 07 10:497 <br /> The year-to-date rculation total is 11 Olr 713 items. We began circulating <br /> downloadable audio books in Mid March and had 12 circulations as of March <br /> 3&. The new product is called overdrive and is featured prominently on the <br /> CLAMS website. I expect circulation of this product to increase as patrons <br /> become aware vire are offering it. <br /> 11e are in full roving mode noir. Press releases have gone out to the media <br /> announcing that the library will close on May 2o . The staff will be packing up <br /> the contents of the library for the rest of that geek. The DPNH and the Sheriffs <br /> Department will physically move the contents of the library on May 27th to the <br /> neer location on .toy street. David DelVecchio, ashpee's IT Director, MOO <br /> coordinating things with Comcast and CLAIMS to ensure that we have telephone <br /> and CLAMS services at the temporary library. The official reopening and ribbon <br /> cutting is 930 on ,dune 4th. Representatives of the town and south Cape Village <br /> will be on hand. Any trustees that are available that day are encouraged to attend <br /> the reopening ceremony. <br /> The staff have been preparing for the move by packing up those parts of the <br /> collection that will go into long terra storage. There are about 5,000 items now at <br /> Flagship storage. <br /> - The library is having an Amnesty period from May 12th until the reopening. The <br /> staff hopes to recover long overdue items prior to the move. This is the fiat <br /> amnesty period in about 20 years. It is hoped that residents will take advantage <br /> of the amnesty to clear their records of older overdue items. <br /> The most runt meeting of the Planning and Construction subcommittee met on <br /> April 3&to review the budget estimates which Stewart Roberts had present to <br /> the committee at their previous meeting. The estimates were about $700,000 <br /> more than the project budget. The subcommittee,met a week later to discuss <br /> gays to carry out the project within budget. The subcommittee agreed to shift <br /> money from the furnishings budget to the construction budget and to fund that <br /> through fund raising. The furniture isn't need for at least 18 months so its costs <br /> could be deferred and the furnishings are something that residents would be <br /> interested in donating. Reductions were made in the demolition costs. Catherine <br /> Laurent fell the figures provided to demolish the building and park lot was much <br /> higher than the projected east. It was agreed to defer the cupola unless <br /> someone wanted to donate it. Interior finishes were discussed for the first time. It <br /> was felt that the estimator selected more expensive options than the library had <br /> ever intended to use. The cost for the photovoltaic panels was removed from the <br /> construction costs. The subcommittee felt the town would issue that as a <br />