Laserfiche WebLink
Jane Dolan said she attended the July 2nd Planning and Construction Meeting. Jane said the biggest thing was <br /> the delay of construction because of all the rain we've had. Helene added that with the break in the weather <br /> they did get work done and it looks as though they've made up some of the lost tinge. <br /> Jane said that it was mentioned at the meeting haat all major change-orders are expected behind then,which is <br /> good news. <br /> Helene reported that the furniture has been pretty much selected but for the chairs upstairs Helene <br /> recommended upholstered rather than all-wood chairs because patrons sit at the upstairs tables for a long <br /> length of time and upholstered chairs would be more comfortable for this use. In addition, since many seniors <br /> using these char, they are lighter in weight to move,gather than all-wood chairs. <br /> } <br /> Time Ca sule...Jane Dolan Mash reported that the a Enterprise gess release ran in the July edition, Two <br /> p p <br /> people have commented. She suggested that a small container be placed in the Library to accept <br /> recommendations. At the end of August, Jane will re-run the press release. <br /> Jane suggested a Committee be formed after we obtain ideas and suggestions about the Time Capsule. The <br /> Cottee could review and decide what should go into the Time Capsule;what the pedestal base would be; <br /> and select a piece of art. Nancy Soderberg commented that maybe we could include somethi <br />