Laserfiche WebLink
Mashoee Public Librarv., _PCO/Change_Order,L ! 1/30109 <br /> � DESCRIPTIONsue Reason For Change OriginFinal l�ar�gurreni <br /> Date Value Value Class <br /> PCO 21 Second floor water cooler 9/14109. "Chiller"com anent of original water cooler-would not fit clue to a cross brake 0.00 2,157.00 Design A2proyes <br /> P C O 22.Tile at donor wall 0116109 Requested,by the Friends of the Library post construction stet. 1,820.00 1,6 0.00 Upgrade Recommend <br /> mend <br /> E 426 Rolling shelving rails.- 511/09 Necessary tc accommodate new room size with old library equipment. '1,100.00 1,319.00 Upgrade Approvei <br /> PGO 20 Sy2port system for precastpanels at entrance, 8/19109 Issue between Arch and Filed-sub as to res onsibili -RP suggested 60150 to move on- 6,000.00 5,264.00 Scope Recommend <br /> E#27 Paint by owner 9117/09 Specifications call for"Owner"to provide exterior trim 2aint 1,485.00 1,486,00 Scope Approve. <br /> PCO 23 Flooring upgrades 10/1/09 Change After Fours entry hallway from c t to slate- 6,419.00 5,708.00 Upgrade Recornmenc <br /> E#29 Remove an additional 10 trees along 161- 10126109 Trees are just beyond clearing limit but are at risk due to grading changes in area. ,159.00 2,234.00 URgrade Recommens <br /> E#80 Provide interface law voltage wiring. 10/27/09 Required for door controls,not shown on drawings. 826.30 831.00 Design F ecommenc <br /> 11-landicapsidewalk modifications. 11111/09 Necessary to make grade work along Steeple Street and to kee2 a curb reveal. 1,400.00 0,00 Upgrade Verbal gliven to rocee <br /> E#31 Block in and flash masona returns. 1111/00 Necessary to close in several ares where masonry/siding masonry/sidinginterface could not be resolved, 1,776.00 1,77 .00 Design Verbal given to <br /> E 434 Added duct work in boiler room. RFf##08,need more information. 1 615.40 515,00 Design Under <br /> CE,# Added mulch along east bound2 11/1/09 N ecessary to dress u area where Mash pee Commons c rig in ally would Dave had a sidewalk.- 2,000.00 0.00 Upgrade Agreed on a per <br /> Tota is $129%434.81, $98,773-00 <br /> Totals by khan aClass: Chafiqe order RocaI2 <br /> Scope $31,463,00 co#i <br /> Non-Scope 0.00 CO# <br /> Design 45,820.00 CO# <br /> Upgrade 21,500.00 CO#4 <br /> Total $98x773.00 co 95 <br /> co#6 <br /> Total <br /> r <br /> Pomroy Associates Most Recent Report 11-30-09 ` <br />