Laserfiche WebLink
4 <br /> I <br /> Town Hall .0 Mbps Calle <br /> Connection tc Water Tower on0 Direct Network Services <br /> Internet via Meetinghouse road � r:# � <br /> ""Ftk- <br /> Comcast Wireless Network <br /> Tsunami MIP Proposal <br /> 20 Mbps <br /> - w Base Station <br /> DPW Tsunami MP 20 Mbp ' <br /> } Subscriber Unit <br /> F <br /> y <br /> - Qu tenet Tsunami MP 20 Mbp i <br /> School Subscriber Unit a <br /> Optional Cisco Tsunami Quick <br /> . 2691 F outer with <br /> Bridge 0 Link ` <br /> {• VPI for IPEC <br /> New Cisco <br /> Encryption I <br /> I y .+, <br /> Fi ewall <br /> PoliceTsunami IIP 0 MbpsA. <br /> .. rDept Subscriber Unit <br /> MONTHLY COSTS <br /> Fire Tsunami IVIP 20 Mbp <br /> Town 'Hall (Comcast C $300 Dept Subscriber Unit E <br /> Town Half (Web Server and Email Accounts with MecNet) $100 <br /> TOTAL MONTHLY $400 <br /> TOTAL. ANNUAL $4,800 <br /> � I. <br /> r <br /> ONE TIME INSTALLATIONIPURCHASE COSTS <br /> Tsunami MP 20 Mops Base Station $4,999 4-Tsunami MP 20 Mbps Subscriber Units ($1 ,499 each) <br /> Ts,unaml Quick Bridge. 20 Link $3,999 . Tsunami Base Station Power Brick $821 <br /> 5-Transtector Lightning Protection ($120 ea $600 Tourer Installation $2,000 � <br /> Base tat Ir t ll i n $950 4-Suscriberk Unit Installations ($150 each) � <br /> Point to Point Installation $1 ,400 Cisco '2691 Router w/AlM Module $7,645 <br /> Router Installation 1000 TOTAL COST $301 010 <br /> f <br />