My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/10/2007 CABLE AND ADVANCED TECHNOLOGY COMMITTEE Minutes
>
4/10/2007 CABLE AND ADVANCED TECHNOLOGY COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 12:52:43 PM
Creation date
5/7/2018 12:51:16 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CABLE AND ADVANCED TECHNOLOGY COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/10/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. Certified plot plans <br /> 9. Health: 1,000 plans / 6,000 —8,000 cards <br /> a. Septic as-builts (mostly 3 X 5 cards) <br /> b. Health Site plans (Septic design plans) <br /> c. Restaurant floor plans <br /> 10.Conservation: 3,000 <br /> a. Resource Area Delineations <br /> b. Conservation Site Plans (notice of intent) <br /> c. RDA (request for determination of applicability) <br /> 11.Miscellaneous: 1,000 <br /> a. Address maps <br /> b. Chapter 91 licenses (mean high water to mean low water) <br /> c. Contaminant maps (chapter 21 E) <br /> d. Voting precincts <br /> e. Police districts <br /> f. Fire districts <br /> g. many more... <br /> 12.Fire Department: 1,000 — 2,000 <br /> a. Engineering drawings (drawings not maintained in Building or <br /> Planning) <br /> b. Architectural drawings(drawings not maintained in Building or <br /> Planning) <br /> ➢ There are approximately 18,000 plans that will need to be scheduled as <br /> part of the scanning plan. <br /> ➢ All scans of building, health and conservation documents 11 X 17 or <br /> smaller (including index cards), will need to be considered for naming <br /> convention purposes only, these will not be a part of the formal scanning <br /> project schedule. There are approximately 25,000 of these. <br /> ➢ The naming convention outline needs to be flexible in that it will have to <br /> accommodate new categories and remove older categories over time. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.