My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/10/2008 CABLE AND ADVANCED TECHNOLOGY COMMITTEE Minutes
>
6/10/2008 CABLE AND ADVANCED TECHNOLOGY COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 5:05:41 PM
Creation date
5/7/2018 1:12:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CABLE AND ADVANCED TECHNOLOGY COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fable Consortium Update <br /> Ju , 2008 <br /> The Board of Selectmen will be reviewing the contract for the U ass survey process at <br /> their next meeting. <br /> The survey process loops like this: <br /> 1. Data collection(Center for Policy Analysis, June 2 , 2008 through June 2 , o . <br /> 2. Data Entry (Center for Policy Analysis, complete by July 8, 2008). <br /> . Data Analysis and Draft Report(Center for Policy Analysis, complete by.duly 3 1, <br /> 2008). <br /> . Final Report(Center for Policy Analysis, complete by August 14, 2008). <br /> . One 1 unbound color copy of the final report suitable for reproduction (Center for <br /> Policy Analysis, August 1 , 2008). <br /> . Posting of survey results irep orta le document format on Center for Policy Analysis <br /> website. <br /> . one public presentation of survey results as designated by Contact Person identified <br /> i in Paragraph 8 of the Agreement. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.