My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/13/1998 MASHPEE COMMONS ADVISORY COMMITTEE Minutes
>
1/13/1998 MASHPEE COMMONS ADVISORY COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:03:15 PM
Creation date
5/9/2018 11:52:12 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
MASHPEE COMMONS ADVISORY COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/13/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 <br /> Review Preliminary Environmental Studies <br /> Mr. Bra i <br /> r� s reported the traffic and eni ro=ent a l scopes have <br /> been reviewed by the Consultants who have made comments and. <br /> additions . The nature of the comments on environmental is t <br /> address coverage and run off issues and to have a general <br /> overview of any other potential environmental impact types. <br /> Selectman Dinizio requested a copy of the critique. <br /> mr. Brais reported the basic comments were technical issues <br /> about the review and also the time horizon to be reviewed. Mr. <br /> rais suggested the year 2004, which is a typical five-year time <br /> horizon is not adequate. In addition, a full build out scenario <br /> should be considered with regard to the traffic and other impact <br /> perspectives . <br /> Mr. Storrs Ornade reference to spread sheets indicating the <br /> amount of nitrogen contributed from waste water flow and the <br /> difference between impervious and pervious surface. <br /> Sharon Rooneyinquired if the Traffic staff has been <br /> contacted in regard to the traffic scope. Mr. Storrs responded, <br /> "I don' t think they have. " He stated the two Consultants wanted <br /> to agree before contact with the Commission was made. <br /> Selectman Dinizio stated his support for a parallel process . <br /> Jeff Bronow commented on the phasing issue, stating there is <br /> a difference between looking at the fiscal results of looking at <br /> the project as a whole vs. looking at the fiscal results of a <br /> certain phase over time depending on the mix. <br /> It was determined to schedule the next meeting for Tuesday, <br /> January 27, 1998 at p.m. <br /> The Chairman recognized Beverly Kane, who inquired as to the <br /> Community Informational meeting scheduled for January 21st, as <br /> well as an updated time line. <br /> Selectman Dinizio responded that consideration of the <br /> Phasing Concept would warrant adjustment of the Gantt Chart; and <br /> that future community Meetings would be scheduled after the <br /> January 27th Co nittee Meeting. <br /> Selectman Rini io suggested the possibility of a Special <br /> Town Meeting could be called at a later date if people are not <br /> satisfied by the May Town Meeting date. He stated this Meeting <br /> indicates the Selectmen are trying to be responsive to the <br /> concerns of the Townspeople; the Developer has shown cooperation <br /> to dissuade some of the fears as well . <br /> -lo� <br />
The URL can be used to link to this page
Your browser does not support the video tag.