Stepben Giatrelis <br /> 7Nicoletta's Way <br /> Contractor Space- Storage/Warehouse/Industrial Space <br /> Mr. Giatrelis proposes construction of two buildings, one 6,600s and 3,300sf, for a total o <br /> 9,90s acres. <br /> The addresses will be noted as 70A,B,C,D E, F and 68 A,B,C, ,E,F. <br /> The design flow is 75gpd for office space. Mr. Giatrelis is designing a comprehensive septic <br /> system. Glen noted that anything over 600gpd will need to go through a de-nitrification process. <br /> The proposed use is storage. Glen would like to see the septic capacity larger for accessory <br /> office use. This project is under lo,000s , and therefore skirts the CCC review. Mr. Giatrelis is <br /> seeking a variance since he is not connecting Phase f construction to a de-nitrification system. <br /> Glen recommended a larger leaching field to accommodate office space use. The next step is <br /> Design Review. ZA needs to approve the use in the Industrial Zone. Catherine asked about a <br /> Special Permit requirement, since this project was approved way before Phase 1. Catherine <br /> referred to the new Sedimentation Erosion -Lav affecting erosion during construction. Mr. <br /> Giatrelis will do research on S-1 (moderate)and S-2 (low)non-combustible classifications for <br /> fire walls between wits, and he will make the side walls engineer approved, 2-hour,fire-rated <br /> assembly. Fire alarms will be installed. His intent is to sell the wits. Each tenant will need to <br /> apply for an occupancy permit. He will need to clarify office use for the Board of Health. <br /> The Committee approved the project. <br /> The Minutes of February 24,2006 were approved. <br /> Sheldon commented on the Stu Bornstein project, noting the yard hydrants and the size of the <br /> main feeding these hydrants. He sent the water needs to the water Department for their <br /> comment. <br /> i <br /> Meetixzg ad'oumed at 11:15 a.m. <br /> Mary elsthrpe, Re ding Secretary <br />