Laserfiche WebLink
some access from Rte 28 which is a Town Road. Glen asked about the Ruck system for the <br /> septic. will they tie in with Talanian's septic` They are at limit for Title v with the other <br /> project nearby. The police are concerned with pharmacy medicine storage. An alarm needs to <br /> be put on the phanrnacy door. The pharmacy will be located on the way out. The building type is <br /> determined by the occupancy load. There are egress issues to consider. Fire sprinklers and <br /> alarms are calculated into the plan. The load for doctors is 2pd and dentists 200gpd per <br /> chair. The door swing in the bathroom stall should be ' and 1 per 45 people toilet ratio for 100 <br /> occupancy. The exterior will be clapboard/shingle. <br /> PID Analyzers <br /> 628 Main Street Cheapo Depot and Gateway Christian) <br /> Discussion <br /> Dr. Jack Driscoll and daughter <br /> They are considering purchasing the building for use to test software, do research and <br /> development,for a photo ionization analyzer that measures hydrocarbons in the air and water. <br /> These products are used by the FBI for arson investigation. The property is zoned C-3 now. <br /> They plan to employ 12 people maximum and later adding 4-5 more. They will use 30 percent <br /> of the building and rent hays below. They plan to occupy 3,500sf on the l Moor and use 1,000sf <br /> on the 2'Boor for R&D lab and demo area. The remainfing space on these floors would be <br /> rented. There are two tenants there now. There is no Town water there. Anteing over 2 <br /> people requires a DEP public well permit. A non-transient permit by the State sets a radius wi <br />