My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2006 PLAN REVIEW COMMITTEE MINUTES Minutes
>
10/13/2006 PLAN REVIEW COMMITTEE MINUTES Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:22:55 PM
Creation date
5/9/2018 1:24:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLAN REVIEW COMMITTEE MINUTES
Meeting Document Type
Minutes
Meeting Date
10/13/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tires and batteries may not be considered ha. adous. Mr. Born t ' <br /> s will get an op*noon on tires <br /> from his engineer. Sheldon would life to be involved in the discuss' ' <br /> xn� the Engineer re <br /> sizing of the water line from Rte. 28 so that there will be enough Water " i . <br /> noting that � not big <br /> enough for flows. They need a sprinkler system and t <br /> s sstandpipe ern and t <br /> . .. he design shall <br /> require approval from the Fire Department. A fire protection engineer c <br /> - n provide this and sen <br /> copy to Sheldon. <br /> Mr. Bornstein re ie ed the site plans for the ` <br /> } p proposed Building 1 and �, each�, sf <br /> footprhnt, along wrtl-i the existing bulldrng measuri 041 sf. The proposed pose buildings will each <br /> measure 60 x 450 with two levels. These will be rirna.rily for storage of records. Included ncluded in <br /> the packet were a la-rids.cape site plan, grading and utilities sitelay and <br /> detail � � septic and landscape <br /> #1 cued #2. Since this is controlled construction, the architect needs tor <br /> p par a code <br /> analysis and a Chap. 9 narrative with construction documents. There need <br /> to be ars acceptance <br /> test with the Fire Department. <br /> The police expect security cameras and a lode on the d-Lu ste <br /> p r . The question of abandoned <br /> units and their contents cavae up since there is a potebtial for dumping in the <br /> woods. . <br /> The use'group identified-is Use 2: Office Use. <br /> The septic is estimated at 840gpd which meets capacity for Title V,for the total square footage <br /> for both buildings. Any change of use.Will r uire a review by the Health Department-since it <br /> could change flow requirements. Leaching is estimated at 12 0 T <br /> 290gpd. Treatment is proposed <br /> using a fast de-nitrifying system. <br /> The wilding Inspector asked ed members to forward their comments on this project. <br /> The following are-subsequent convents-regarding thisro'ect: <br /> J <br /> Town Planner: I r. Bornstein will Fire Department a <br /> . in-corporatep and other suggestions re: <br /> hazardous materials storage and submission o worl n drawings into the drab ` <br /> . g SpecialPeri-nit <br /> Decision ion to ument. <br /> Health epar-tment: Mr. Bornstein was.infonned f rmallaps have not been <br /> p submittedto the- <br /> Board of Health for review at an upcoming public meeting. Storage of hazardous waste will b <br /> more clearly.defined by the Board once a decision is rendered. This i usually included in <br /> . .t he <br /> OFT written decision. Subsequent to the-meeting it was learned that thercel <br /> p was never <br /> legally subdivided. This rr�eans that the lot is considered under one-owrlershi and <br /> . p� fir. <br /> Bornstein will be required to acid a 1/A de-nitrification.unit to the existin' leaching ' ' <br /> . g g facility <br /> which accorm rrodate the former "A gat" facility. <br /> uIldingDepartment: We would like-to see a set of final working drawings g show' the most . <br /> intense layout of the first Floors. At present the "layout" is very,grag ue. It would be in the <br /> applicant' best interest to determine the most intense use for this space for ease of rnaaitti <br /> a later date. <br /> � ng at <br />
The URL can be used to link to this page
Your browser does not support the video tag.