Laserfiche WebLink
Page I <br /> #SHPEE SIRE STATION-CONSTRUCTION COSTS r-06 <br /> Site#1 <br /> Varis bles Costs <br /> 4 <br /> r <br /> }Building Square Footage <br /> a <br /> New Construction%f i 6,290 <br /> Existing Building sf <br /> 'Total Square footage 6,290 <br /> Construction Costs <br /> Approximate Demolition COSO <br /> Building Construction Costs 240.00 � $ 1,50 00 <br /> fisting RUilding RenovationCois <br /> .F 1 go.0o ; <br /> Existing BLliIding Structural U pgrades 75.00 <br /> ;ormrnuni ation]'"hnoio i s $ [lI <br /> Construction Contingencies 8.0 xoI $ 120,768 <br /> 4 <br /> r <br /> a <br /> Sub-Total 1:?680368 <br /> Station Displacement Costs '2_9 <br /> Design Engineering Fees ,0��� 134,4 <br /> Project Management 3,I%l' $ 501411 <br /> Furniture And Equipment Cost 100.000 <br /> Additional Project Costs 4 <br /> 67j2 1-5 <br /> Bond Costs <br /> 6,721 <br /> Escalation(Construction Phasing) 0,0%', $ 4 <br /> Sub-Total i 2,039,145 <br /> Construction Escalation to 2007 %per year) 6.0%1 122,349 <br /> r <br /> A11 Acquisition Costs(2005 assest valu ) - <br /> RAND TOTAL 1 $ 2,161,4931 <br /> COSTS PER SQUARE FOOT 344 <br /> Maguire Group Inc. <br /> 33 Commercial Street <br /> Nla tepee Fire Department Foxborough,MA 02035 <br />