Laserfiche WebLink
{ t <br /> Mashpee Planning and Construction Conittee <br /> Mirnutes of Meeting Held Mond y,July 10,2006 <br /> Mashee Town ball Meeting Room <br /> Comm e Members Present: Eugene Smargon,Irving Goldberg, Kevin Sh cl ett, Janice Mills, Joe <br /> Krait, and Tricia Parolski(EOfficio Member). <br /> Absent: Steve Cook, <br /> Invited Participants* Catherine Laurent, DPW <br /> Brad Tripp, Facilities Supervisor Mashpu Public Schools <br /> Eugene Smar ort, Chainnan, called the meeting to order at 7 p.m. <br /> Approval of Minutes <br /> Iry Goldberg noted that it was confusing having layout of only second floor bathrooms attached to June 6, � <br /> 2006 minutes and he provided sketch of first floor bathrooms to be attached to the June 6 minutes so that <br /> it would clearly show that 4 unisex bathrooms were approved to be constructed at Coombs School. <br /> Motion: Iry Goldberg motioned to accept the minutes of June 6,2006 as amended; Kevin Shackett <br /> seconded this motion; and the notion passed,with Eugene Smargon and Joe Brait absta i from <br /> the vote. <br /> Old Business <br /> Bathrooms at Coombs School...Gene Smargon reported that he and Iry Goldberg went to visit the school <br /> to see where the bathrooms were going and made a few suggestions,which Brad incorporated. Brad <br /> Tripp distributed a copy of his memo to each member of the Cottee and the discussion included the <br /> following <br /> 0 All bathrooms are to be unisex and are for staff only. <br /> Iry asked how do you keep students out of the bathrooms? Brand responded they are labeled staff <br /> only and staff monitors that, <br /> • Brad explained location and size of the 4 unisex bathrooms. He explained they chose area where <br /> bathrooms will go because area not used that much plus they pan tie into septic without <br /> tremendous amount of plumbing work. <br /> 0 Most of the work will be done by school maintenance; other work like plumbing, electrical, etc. <br /> will be done by contracted outside professional services. <br /> Brad is very confident they will come in under the$40,000 budgeted for 4 bathrooms because <br /> fixtares have been cut down since these are not student bathrooms. He said they tried to <br /> streand a as much as possible. <br /> • Brad stated they would rent equipment they don't have. Joe Krait said the Sheriff's office could � <br /> let them use heir compressor if needed. <br /> • .brad said one suggestion had been to use louver doors, but because of privacy they felt doors <br /> should be solid and they'll put in vent exhaust. <br /> • Time schedule: will start cutting into the floor tomorrow after this muting. Brad said Joyce i <br /> holding,the permits pending approval of the project by this Cottee. <br /> Motion* Iry Goldberg motioned we accept the plan for the 4 unisex bathrooms at the Coombs <br /> School;Joe Brait seconded the motion; and it was un a nously approved. <br /> Iry com iented that since the timeframe is tight Joyce should be advised right away this project has been <br /> approved and the permits can be released. Catherine Laurent volunteered to call Joyce tomorrow to let <br /> her know it has been approved. <br />