Laserfiche WebLink
W <br /> MEMORANDUM <br /> To: Tovvn of l ashpoe Building and Cori <br /> trutlon Committee <br /> From. Brad Tripp, Facilities Supervisor Maspee Public Schools <br /> ]date: July 10, Zoo <br /> Re: Additional Bathrooms at KCC <br /> As you know the Town has allocated <br /> 40YO00.00 for additlonal straw bathrooms at the <br /> Kenneth C School. Bathrooms ars going to he added on the first and second door a <br /> rear the library. Tbathrooms are t the t be a single lavatory and sink, unisex ars <br /> securable. The first floor space �s currently a libr <br /> down the � work room and will he dived roughly <br /> middle and t bathrooms add � . <br /> added. The second door space is currently a <br /> small classroom, the area will same as the first fl <br /> divided the veryi <br /> oor. <br /> Accordingthe blueprints there Caere is a four-inch waste line rani thy- • <br /> first floor room. The l through the middle the <br /> plan �s to cut the shah out locate lige and tie into �t. <br /> will framed, rough electrical l The walls <br /> plumbing' and ventilation will follow. <br /> The following contractors will h performing . <br /> p na��n the work. <br /> John Maurer Plumbing _ Pl ing <br /> - <br /> U perCape ElectricalElectricai <br /> + <br /> FSS Sprinkler <br /> Fire Suppression <br /> • Simplex Grinel _ • <br /> �re Alarm <br /> • Mechanical Air • <br /> lat�on <br /> Demolition nt�Construction <br /> Maintenance Department <br /> artment <br /> -Tile School Maintenance Department <br /> - <br /> • Painting <br /> School Mwntenance Department <br /> _ . <br /> School Maintenance Department <br /> • door�. Hardware installation - - p <br /> School Maintenance Department <br /> All of these vendors have a time andatri � <br /> al contract with the school e artment. <br /> Attached xs a list of fixtures t he used the' ' . p <br /> Iis supplied John Maurer Plumbing. <br /> ventilation equipment is still beinginvestigated. The <br /> . <br />