My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2006 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
11/15/2006 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:25:55 PM
Creation date
5/9/2018 2:11:18 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/15/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Public Library <br /> # spe, Massachusetts <br /> Design Revision - few Building <br /> Preliminary Hypothetical 13 udet Estimate of Probable Project Costs Cost <br /> (blot based on a proposed Design) <br /> 11/15/06 <br /> Construction <br /> Site cork Allow $400,000 <br /> Demolition 51220 Sf Allow $60,000 <br /> New Construction 71750 Sf $ B ISf $12821;250 $235 <br /> Total Construction Estimate 71750 St $2r281:250 $204 <br /> E oalatlon to Midpoint construction 101oNear 18 Month $842}188 <br /> Subtotal Construction $2,628,438 $389 <br /> Furnishings <br /> Furniture 72750 St $24 Sf $186rOOO <br /> Computers 0 <br /> Subtotal $186,000 <br /> Project Expenses <br /> Printing Allow $16,000 <br /> Burger&Testing Allow $30,000 <br /> fisc Exp Allow $40,000 <br /> Moving A(low $40,000 <br /> Temporary Facility Allow $60,000 <br /> Project Manager 2.50% $65,886 <br /> Subtotal $251#886 <br /> Professional Fees - <br /> rchitecture 1 1. 00 $288,578 <br /> i -- Subtotal $288,578 <br /> Project Contingency <br /> Contingency 5% $167,480. <br /> Total Budget Estimate of Probable Project Cost $81517:082 $454 <br /> * Current Estimate includes esclation to midpoint of construction in May 2008 <br /> This Schedule requires Schematic Design to begin by December of 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.