My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/18/2007 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
9/18/2007 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:19:05 PM
Creation date
5/9/2018 2:23:30 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/18/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> Mashpee Plannin and Construction Committee <br /> Minutes of Meeting Meld Tuesday,September 1 ,2007 <br /> Mashpee Town lull Meeting Room <br /> Committee Members Present: Eugene Smargon, Irving Goldberg, Joe Krait, Kevin Shuckett, Steve <br /> Cook, Sheldon Gilbert,and Tricia Parolski(Ex officio Member). <br /> . <br /> Absent: Janice N#ills. <br /> Also Present. Catherine Laurent,DPW <br /> " hairrnan Gene S argon called the meeting to order at 7:01 p.m.. <br /> Approval f Minutes. <br /> Joe Krait motioned to accept the mutes of the Meeting of August 7, 2007;Kevin Shackett seconded the <br /> motion; and the motion was passed.,with Steve Cook, Sheldon Gilbert, and Tricia Parolski abstaining. <br /> Q14 Business <br /> New Fire Subston <br /> Catherine Laurent-provided.an.updated,devel4m nt-b et,and..she.pointed.out.that.these,latest-numbers. <br /> came in lower to a little over S 1.5 million. A copy of this pdated budget is attached to the,printed set of <br /> hese minutes. Steve Cook and Catherine pointed out to the Cottee the changes in construction that <br /> were made by the subcommittee which resulted i�lowering the construction costs. Catherine said the <br /> only way we will f d out the actual costs are when the project goes out to bid. other points discussed <br /> iclued'tie f611owig: <br /> Some-items Town-will-be-respon0le-to-handle,b -if money'leftd tin of 'fund then <br /> maybe some-o `the-items an -contracted-out. <br /> Architect,and,engineer met-yesterdayto move.ahead,with-final' -al the pl ans. . <br /> Plans,to.be finalized and expected.to,g6 to-bid on,October 1.7;.-and gpneral.bidsdue November.28. <br /> Need.landscapmg--plan,= .W <br />
The URL can be used to link to this page
Your browser does not support the video tag.