My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/4/2007 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
12/4/2007 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:28:20 PM
Creation date
5/9/2018 2:24:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/04/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
:5�`a'x''"$sY6ai4i nN"wxrw4 w.r.wY�rrr-w••rr......+....r..wwivt+'w'+'�rwr wt <br /> iY :.`:Y�_3 #$ ++�rtr,�r...r.....,�yy.•.ai.....�+Hw'ww+.++�.'-+wr.r.Mwvvwwrr."r'.+wv...hMr.wwt....nww.uvw,.,".....,,.+r+-i+i.wn..v.an+..,..".•-m w.rrw rw� <br /> 3..e <br /> KA V!il► e Pta a 1448 1 urnpike Street,Suite 2-11 South Easton, 0 <br /> n <br /> associate's <br /> www.pamroyassociates.com <br /> South MFire Substation Proiect <br /> Status Rgeort - <br /> December ,2007 <br /> Current Status . <br /> I. Bidding Results—Attached please find the tabulation-of G .bid results.The first lowest bidde <br /> .r was disqualified, <br /> for failure to properly complete the GC-bid form. PA confirmed the disqualification vith'th AG's office. The <br /> next lowest most eligible-bidder is B.arbato Construction from Middleboro,.MA. The bid percentage spread of <br /> the first bidders (including the rejected bid) was 2.32%. Dtis is a very low percentage spread and reflective <br /> on the quality of the documents. PA would recommend accepting both bid alternates for a.total GC value of <br /> $1'4123474..00. <br /> . Bidder Bid Form and AM Checks—PA performed a thorough review of bid forms and. � 1 files for <br /> the following low bidders. General Contra tor, Plu' robing,HVAC and Electrical.PA did not perform DCAM file <br /> reviews for Roofing_and Flashing, Gypsum wallboard and Painting. ' . <br /> • <br /> GC JBarbato)—Bid forms appear to be complete and in order. DCAM file was re ieW'ed and appears to <br /> be fine. Arg DCAM rating—94.. <br /> 9 -Plumbin Robert W. Irvin -Bid forms appear-to be-complete and in order. DCAM file was reviewed <br /> and appears to be fine. Avg DCAM rating—94. <br /> * HAG G'&H Heatin &Cooling)—"The incorrect DCAM Eligibility form was used. PA has discussed <br /> the issue.with DCAM and the AG's office. It appears that DCAM may have created theP roblem on <br /> their end and the G's office has ruled that as DCAM had created the problem, the bid can be accepted. <br /> ,DCAM will be creating the correct Eligibility form for Hand endin nye co for the r 'ect <br /> g Py p J <br /> records. The remainder of the bid forms appear to'be complete and in order. DCAM file was reviewed <br /> and appears to be fine.Avg IAS rating—95. <br /> Electrical a side Electric - Bid forms appear to be complete and in order. DCAM I file was reviewed <br /> and appears to be fine. Avg DCAM rating—94. Of particular note is that Bayside has not been involved <br /> with a public project up to this"pint and DCAM had only projects rated on the private side. <br /> Bidder Reference Checks — A performed a reference check for the following low bidders. General <br /> Contractor, Plumbing, HVAC and Electrical. PA did not perforin reference checks for Roofing and Flashing, <br /> Gypsum.wallboard and Painting. The reference checks were established from a random selection of DCAM <br /> projects.The goal was to gain a minimum of favorable references, <br /> rG arbato — Four references were called and PA received excellent recommendations from all <br /> (4) the references called. Of particular note is thatarbato has recently completed projects for the <br /> 11rlashpee.mater District and Andy Marls thinks very highly of the company.. <br /> Plumb in (Robert W. Irvin Four references were called and PA received excellent <br /> recommendations from of the references called, and have not heard back from the 4 at this time. <br /> HVAC G & H Heating& Cooling)-- ree referen es were called and PA has not heard back from <br /> any of the t this time. .� f <br /> Electricalside Electric - Three references were called and PA received excellent references <br /> from all the references called. Of particular note is that Bayside has not been in led with a <br /> public project up to this point. Based upon the DCAM fillings and past project history it appears that <br /> ply <br /> Bayside has the ability to complete this work and they have performed on much larger projects than the <br /> Fire Station No. 2 project. It should be noted that the Town of Mashpe has received a letter from The <br /> Foundation-for Fair Contracting of Massachusetts sitting""grave"cone m that Bayside will be unable to <br /> perform and adhere to prevailing wage rates.The Town of Ma hpee has also received a letter from <br /> Pomroy Associates—Mashpe — 12/4107 Project Update Pae 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.