My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/4/2007 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
12/4/2007 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:28:20 PM
Creation date
5/9/2018 2:24:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/04/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Action Item <br /> Steve Cook asked the Committee and Helene Ie 'oe to bring ideas to the next Conrittee meeting on <br /> what they would suggest for the Library construction project. The input from all can then be reviewed <br /> and considered. As an example, Steve said a few of the items he was thinkm' g about are: <br /> Panels for roof to generate electricity. <br /> • Capture roof run-off water for irrigation use. <br /> Low V C paint/carpet/flooring. <br /> • High-efficiency HVAC and lighting. , <br /> Low-maintenance landscaping. <br /> Dy lighting and window shading. <br /> Peter white exited the meeting at 8:05 p.m. <br /> TMpoM Ubr•_M Location <br /> Catherine distributed some of the requirements needed for temporary location that Helene had mentioned. <br /> A copy of this list is attached to the printed set of these minutes. In addition,Helene stated that they <br /> would need some type of partitioning in the building if they go into open space area. Helene said parking <br /> was not a concern because if they need mo a parking they could go to a facility such as school, church., <br /> outside so they'd have ample parking for programs. Catherine emphasized that ihe location would have <br /> to enable wireless coverage. This would rnean they have to have a.roof antennae and it would also have <br /> to be within the range of town hall tower location. Helene also ported out that not only for wireless <br /> coverage,but also for the Library to be connected to Town Hall systems they have to be connected t <br /> Town Tall system. Helene added that part of RF Walsh"s responsibility would be to help us with <br /> temporary library location site. Other considerations: <br /> • January is when this would start. <br /> • .F Walsh said they could move out before the summer rush, which would be best. <br /> • Catherine said it would he a bid process. <br /> ► Industrial Park site.:■Catherine pointed out some of the buildings don't meet code requirements— <br /> for example fire codes. <br /> Media contact for,projects...Steve Cook said he spoke with Joyce and Joyce recommended that any <br /> questions from anyone should come through Steve as Chainnan of Planning and Construction Conurdtte . <br /> Meetings Scheduled <br /> Two meetings scheduled in.Tanury as follows: <br /> L Thursday, January 10, 2008 at 6 p.m. at Town Hall. <br /> 2. Tuesday, January 15, 2008 at 6 p.m. at Town Mall. <br /> jo, rx �rnent... <br /> ■ <br /> The meeting was adjourned at 8:25 p•m• <br /> espectfuUy submitted, <br /> Gifierti <br /> ecording Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.