Laserfiche WebLink
P <br /> 0 Village Place 1448 Turnpike Street,Suite 2*11 South Easton, 1 023751 T 5081238.50401 F 508/238-5042 <br /> Z�f3o <br /> associates www.pomroyassociates.com <br /> Mashpee Libra1y ProBeet _pdate <br /> MeeU Agenda <br /> September 2,200 8, :30pm <br /> Fawn Qffilcials Present <br /> Joyce Mason Rene"Read ],Catherine Laurent ],Helene IeFoe <br /> Committee Members Present <br /> Steve Cook,Chairman Iry Goldberg,Vice Chairman � ],Janice Mills,Clerk <br /> Joe Brait ],Sheldon Gilbert a,Tricia Parolski [ ],Devin Sha kett[ ,Eugene Smargon ]. <br /> Manaieement Team Present- <br /> Richard Pornroy <br /> Azenda <br /> 1. Public Library <br /> o Current Progress — A Quality Control ("QU) Review of the project bid documents was completed <br /> by the Team during the month of August. The QC review went well and all comments/questions were <br /> addressed. JSR to submit final status report to PA of all QC comments. Documents were prepared for <br /> biding period to start on August 22", but several opportunities came up at the State level. These were <br /> discussed at the 8120/08 committee meeting and it was decided to delay the bidding 2 weeks to take <br /> advantage of the opportunities. They were; <br /> . The issuance of the 7`h Edition of the State Building Code. The new code allowed us the <br /> capture an additional 340 sq ft within the existing building footprint by eliminating 1 <br /> emergency stair. There will be some additional design costs to modify the plans and specs, but <br /> the cost savings of eliminating a stair will more than offset the change. <br /> b. The possibility that the State may be issuing grant monies for buildings to become LEER <br /> (Leadership in Energy and Environmental Design) certified. As the project design currently <br /> incorporated many LEER dualities, the team agreed to modify the project documents to <br /> capture the certification. The project is currently looking for LEER points in the crud 35 which <br /> will capture a LEED Silver Certification. The lowest certification is a LEER Certified <br /> classification at 26 to 32 points. The cost for re-design, bidding delay, certification and <br /> requirements for materials, waste disposal contractor requirements are estimated to be in the <br /> range of$120,000.00. The projected state grant funds for LEEK Certification are projected to <br /> be approximately $150,000.00. <br /> o Project Schedule — The revised project schedule is as follows; Bid Start 9/5, Filed Subs 1011 noon, <br /> GC's 10115 2:oopm. Notice to Proceed will occur on November ember , 2008 and Substantial Completion <br /> by January 8, 2010. <br /> o Project Budget—The additional 15% State Grant monies from 11BLC has been awarded. The project <br /> budget has been revised to reflect this and the furnishings line item has been added back into the <br /> budget. The project budget at this time with the items above incorporate represents a balanced budget <br /> with a 7.5% Contingency. <br /> 0 open issues —Cape Light Compact has completed their review and PA will get an estimate of the <br /> rebate amount and any comments. <br /> o Project Invoices—Presentation <br /> 0 open Discussion <br /> Pomroy Associates—Project Update-Library—8/4/08 Meeting Agenda Page 1 of 1 <br />