My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
1/28/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:05:00 PM
Creation date
5/9/2018 2:33:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/28/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
w <br /> e <br /> Tillage Place 1 4tiS Turnpike Street,S Laite 2-11 Borah Easton,MA 02375 1 T 508/23$}.50401 F.508/23$-5014.2 <br /> s <br /> 7 <br /> PF `� <br /> associates <br /> ,pomiroassacits.corn <br /> Mashpee Fire Station No 2.Project <br /> Memorandum <br /> Date: January 23, 2009 <br /> Subject: Vehicle Exhaust Recovery System. <br /> To: To whom It May Concern <br /> From: Richard W. Pomroy, owner's Project Manager <br /> The Town of Ma tepee, MA recently completed the construction of its new Fire Station No 2. The project <br /> included the installation of a new Vehicle Exhaust Recovery System "VERS" to acconnnodate 3 vehicles. <br /> The VERS work was bid separately from the general contract and scheduled to be installed after the general <br /> contractor was 100% complete and off of the project. <br /> The Town of llashpee hid the VERS work publially and the contract was awarded to Murphy eialt Inc. <br /> n September 3, 2008 as the lowest responsible bidder. Murphy Specialty Inc's bid was based on a pneumatic <br /> exhaust venting system manufactured by HazVent. As part of the quali <br />
The URL can be used to link to this page
Your browser does not support the video tag.