Laserfiche WebLink
1 SASH EE PUBLIC SCHOOLS Maintenance enanee Department <br /> 500 OLD BARNSTABLE ROAD <br /> MAS EE., MA 02649 <br /> 'Maintenance Department <br /> Phone: 508-539-3600x1514 <br /> Fax: 508-539-0872 <br /> Patricia, <br /> Mere is the rough estimate regarding transforming the middle school principal's office <br /> into a nurses station and moving the principal's office to room Al 2. These numbers are <br /> very rough numbers and will need to be adjusted if this project gees forward. <br /> Materials costs <br /> Plumbing — $16,500-$18,000 <br /> HVAC — $18,000420. <br /> Electrical = $4,000-$6,000 <br /> Building materials $10,000412,000 <br /> Door access/security $11,000 $121000 <br /> Bathroom flooring repair $161000418,000 <br /> Labor Costs <br /> The rough estimate is for 300 man lours, which is probably on the high side. <br /> In house it would be $19..1 x 300=$5754.00. <br /> To outsource the average prevailing hourly wage for this project would be $50,00 x 300= <br /> 159,000. <br /> Total estimate materials costs; $75,500-86,000 <br /> Total estimate labor costs: $5.9754-15,3000 <br /> Total cost: $81,3,254-101,000 <br /> Please contact me i <br />