My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/1/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
6/1/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:14:35 PM
Creation date
5/9/2018 2:34:52 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/01/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Public Libra PCO/Change.Order Log - 6/'x/09 <br /> # DESCRIPTION Issue Reason For Change Original Final Change <br /> Date Value Value Claus <br /> P1 Electric primary installation originally by MLP 12123108 IILP was originally to install and ML to snare in 50150 cost. $33,023.00 $28,588.00 Scope <br /> PCO2 .Curbing along Steeple Street and in entrance drive. 212109 Scheduled to be completed b y M LP. Put pricing together to- M out. 13,183.00 0.00 n1a <br /> E1 Structural Steel Modifications 2118109 Elements of structural steel which did not get incos orated in final design. 11,904.00 11,904.00 Design <br /> n <br /> PC03 Elevator Vnt Modifications 4/16109 Credit: Reduced height of structure which chary es framing copper claddlr� -880.00 -880.00 Design <br /> PC04 Roof Flashing 4110109 Exploring the option to upgrade the roofing flashings from aluminum to copper, 4,903.50 4,908.50 1..1 grade <br /> PCO5 Recessed TV Cabinet 4129/09 Provide recessed area in the millwork to accommodate a new informational screen. 0.00 0.00 Upgrade <br /> PC06 Asphalt Shingles Revision 4129109 Upgrade roofing stent to accommodate 120 Mph wind rating. 9,758.79 9,758. 9 <br /> P 1lindow Treatment Revisions 5112109 Credit: Eliminate North facing window shades.Add )on South face. 0.00 0.00 Desi n U <br /> PCOB HVAC Revision 5113109 Added HVAC supply at Building Storage Room 113 1,180.00 1,180.00 Design <br /> PC09 Elevator Electrical Revisions 5118109 Credit:Changes to the main distribution panel due to reduced elevator requirements. 0.00 0.00 Design <br /> PC010 Site Lighting Revisions 5119/09 Credit: Deduce number of side walk poles on Steeple and change type at entrance drive. 0.00 0.00 Design �+ <br /> PC011 PV Mounting. 5127/99 Upgrades required to tie PV supports to roof structure. 0.00 0.00 Design <br /> PC012 Door Hardware Revisions 5/27109 Costs associated with providing ( additional doors with security access control. 0.00 0.00 Desi2n <br /> Totals $73.042.89 $50,484.29 <br /> Totals b _ hange Class; <br /> Scope $23,588.00 80%bil <br /> Non-Scope 0.00 <br /> Design 12,204.00 <br /> Upgrade 14A62.29 <br /> Tota! $50,454.29 <br /> de <br /> Pom rOY Associates-Most Decent Report 6/112009 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.