Laserfiche WebLink
Mash Public LPCO/Change Order Log - 7131109 <br /> 9 DESCRIPTION Issue Original Final Change <br /> Date Reason For han�e ValueValue-][ Class <br /> PD01 Electric primag installation originally by NI LP 12123198 MCLP was originally to install and ML to share in 50150 cost. $33,023.60 $23,588.00 Scope <br /> PCO2 Curbing along Steeple Street and in entrance drive. 212199 Scheduled to be completed by M LP. PuL26dng together to help them out. 13,153.00 0.00 nla <br /> E1 Structural Steel Modifications 2118/09 Elements of structural steel which did not get inco orated in final-design, 11,904.09 11,904.00 Design <br /> PC03 Elevator hent Modifications 4/16109 Dred it: Reduced heig ht of structure which cha n2es fram ing&copper claddin -880.09 -1,989.00 Desi2n <br /> PD4 Roof Flashing 4/16109 Exploring the option to upgrade the roofing flashings from aluminum to copper. 4,903.00 5,477M Up2rade <br /> PCOM Recessed TV Cabinet 4129109 Provide a recessed area in the millwork to accommodate a new informational screen. 0.00 0.00 Upgrade <br /> PC06 Asphalt Shingles Revision 4129109 Upgrade roofing system to accommodate 120 Mph wind rating. 0,758.79 10,902.00 Design <br /> PC07 Window Treatment Revisions 5112100 Credit:Elim inate berth fad ng window shades.Add on South face. -2,500.00 0.00 Design <br /> P OB HVAC Revision 5113109 Added HVAC supply at Building Storage Room 113 1,180.90 1,180.00 Design <br /> P 09 Elevator Electrical Revisions 5113109 Credit:Chan es to the main distribution panel due to reduced elevator requirements. 955.90 -955.00 Design' <br /> P 010 Site Li2hting Revisions 5119109 Credit: Reduce a number of side walk.poles on Steeple and chap e..type at entrance drive. -3,049.00 -3,049.90 Design <br /> PC011 PV Mountie 5127109 Upgrades required to tie PV supports to roof structure. 15,000.00 12,224.00 Design <br /> PO 12 Door Hardware Revisions 5127100 Costs associated with_providing additional doors with security access control. 9.90 5,367,00 Design <br /> CE8 DAD design time insured by HVAG sub. 5118109 Time invested by HVAC sub-contractor to coordinate ductwork for GOD. 3,081.00 3,081.90 Desion <br /> PC 13 Revisions to ceiling design in Children's Area 6124199 JR reccomended simplifying the ceiling system after seeing the product submittals. -7,500.00 9.00 Design <br /> PCO 14 Provide backflow preventer for boilers. 7/7109 Required by code. 2,638.07 9.00 Design <br /> POO 15 Electrical floor box revisions in Young Adult Room 718109 Revisions as a result of furnishin meetings, -208.51 0.00 Desi2n <br /> CEI b Lower open i ns at 2nd floor windows 7/7109 Ibis-communication betWeen the Arch and GC that was not documented with an RFI 2,274.09 2,274.00 Design <br /> 'totals 1,823.461 $70,31.00 <br /> Totals by Change Class; Comments <br /> Scope $237588.00 0%billed to <br /> Non-Slope 0.00 <br /> Design 419848,00 <br /> Upgrade 55477.00 <br /> Total $70,913,00 <br /> Chance Order Recap Status <br /> co#1 $38,492.00 Approved <br /> CO##2 30,06 .00 Approved <br /> CO#3 5,355.00 Pending Appr <br /> Total $702913.00 <br /> Pornroy Associates-Most Recent Report 7-31-09 <br />