My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/27/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
1/27/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:05:32 PM
Creation date
5/9/2018 2:44:43 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/27/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Public Librarv - Proiect Change Analvsis w Design Adds ^ 1/26/10 - <br /> Change <br /> DESCRIPTION Value Type of Direct ProjectOrder Ratio of Charge order Premium- <br /> Change Pass-through Premium <br /> Amount Amount <br /> E1 Structural Steel Modifications 11,904.00 Desi n 3,b7'1-20 ° <br /> P 3 Elevator hent Modifications -1,080.00 Design 0.00 -1,080.00 100% <br /> PC06 Asphalt Shingles Revision 10,902.00 Design 7,631.40 3,270.60 30° <br /> PC07 Window Treatment Revisions -700.00 Design 0.00 -700.00 100% <br /> PCOB HVAC Revision 1,180.00 Desi2n 826.00 384.00 30% <br /> PCO9 Elevator Electrical Revisions -955.00 Design 0.00 -958.00 100% <br /> PCO 10 Site lighfing revisions and reductions -3,049.00 Design 0.00 -3,049.00 100% <br /> PC011 PV Mounting 12,224.00 Design 9,779.20 2,444.80 20% <br /> P12 Door Hardware Revisions 6,367.00 Design 3,756.90 1,610.10 3010 <br /> PCO 13 Children's area ceiling revisions -3,800.00 Design 0.00 -3,800.00 100% <br /> E8 CAD design time incurred by HVAC sub. 3,031.00 Design 0.00 3,081.00 +100% <br /> PCO 14 Provide backflow preventer for bailers. 2,445.00 Design 11711.50 733.50 0% <br /> PCO 1 Floor box reduction in Young Adult -209.00 Design 0.00 -209.00 10010 <br /> CE1 5 Lower openings at 2nd floor windows 2,274.00 Design 0.00 2,274.00 100% <br /> PCO 17 PV Inverter Disconnects 1,783.00 Design 1,251.60 836.40 30% <br /> PCO 21 2nd floor water cooler chane 2,157.00 Design 0.00 2,167.00 100% <br /> CE#30 Provide interface for lover volts a wi d ng of door cntrls 831.00 Design 531.70 249.30 0% <br /> CE#31 Block in and flash masonry retums 1,776.00 Design 11420.80 355.20 20% <br /> E#34 Additional ductwork in boiler room 815.00 Design 360.80 154.50 30% <br /> E#42 Field m od ify FP8 I ig ht f-i tune 349.00 Design 244.30 104.70 30% <br /> E#37 lower boiler flue stack 842.00 Design 1 0.00 842.00 1000 <br /> $47.842.00 $35.896.70 x'11.945.30 <br /> 1) The Net Design Change amount at this trrl''le is $47.842,00 ora roximate .7 ° of the Construction Budget of$6,505.810.00 <br /> The true Design Change Order Premium to the Project is estimated at$11,945.30,or approximately %of the Net Design Change Premium. <br /> i <br /> Pomroy Associates-Most Recent Report 1-26-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.