Laserfiche WebLink
M -Pu bl is Li bre ry - PC O/C ham ge Order Log-- 2/28/10 <br /> Issue Original Final <br /> DESCRIPTIONreason For Change � Change Current <br /> Date Value Value Class <br /> P 01 Electric primary installation orAinally by MCLP 12123108 MCLP was originally to install and ML to share in 50150 cost. $33,023.60 $23,588.00 Scope Ap2roN <br /> PC02 Curbin2 along Steeple Street and in entrance drive. 212109 Scheduled to he completed by MCLP.Put pricing together to help them out. 13,153.00 0.00 tela No response f <br /> CE#1 Structural Steel Modifications 2118109 Elements of structural steel which did not get incorporated in final design._ 11,904,00 11,904.00 Design A ro% <br /> PC03 Elevator hent Modifications 4116109 Credit:Deduced height of structure which chap es framing coeper cladding -880.00 -1,080.00 Design ro% <br /> PC04 Roof Flashing 4/16/09 Exploring the option to upgrade the roofing flashings from aluminum to copper. 4,903.50 5,477.00 Upgrade <br /> PCO5 Recessed TV Cabinet 4129/09 Provide a recessed area in the millwork to accommodate a new informational screen. 0,00 0.00 Upgrade Approved,81 <br /> PC06 Asphalt Shingles Revision 4129/09 Upgrade roofing system to accommodate 120 Mph wind rating.____ 9,758.79 10,90 .00 Design Approe <br /> PC07 Window Treatment Revisions 5112109 Credit:Eliminate North facing window shades.Add 2 on South face. -2,500.00 -700.00 Desi p Approved,91 <br /> PCO8 HVAC Revision 5113109 Added HVAC suppty at Building Storage Boom 118 1,180.00 1,180.00 Design ro% <br /> PC09- Elevator Electrical Revisions 5/13109 Credit:Changes to the main distribution panel due to reduced elevator requirements. -955.00 -955,00 Design ro% <br /> PC010 Site LightiE2 Revisions 6119/09 Credit:Reduce number of side walk poles on Steeple and chane type at entrance drive. -3,049,00 -3,049.00 Design Approi <br /> PC 11 PV Mounting 5127109 Upgrades required to tie PV supports to roof structure. 15,000.00 12,224.00 Design ApproN <br /> PC 12 Door Hardware Revisions isions 5127109 Costs associated with providing(3)additional doors with securi access control. 0.00 5,3 7.00 Design A ro% <br /> CE#8 CAD design time incurred by HVAC sub. 5118109 Time invested by HVAC sub-contractor to coordinate ductwork for G G D. 3,081.90 3,081.00 Design $pERved,7!; <br /> PC 13 revisions to ceiling design in Children's Area 6124109 Credit.JR recommended d sim fi #n the ceiling stem after seeing the product submittals. 0.00 -3,800.00 Design Approved,10j <br /> PCO 14 Provide backflow preventer for boilers. 7!7!09 Required by code. 2,638.07 2,445,00 Design Approved,91 <br /> PCO 15 Electrical floor box revisions in Young Adult Room 718/09 Credit:revisions as a result of furnishings meetings. -208.51 -209,00 Design Approved,91 <br /> CE 15 Lower openings a#2nd floor windows 7/7/09 Mis-communication between the Arch and GC that was not documented with an RFI 2,274.01 2,274.00 Design roved,8/ <br /> PCO 10 Door 111 Access Control 815109 Cost associated with providing correct infrastructure at Door 111 500.00 0.00 Design Approved,9/a <br /> PCO 17 PV Inverters Disconnects 8110109 NSTAR requires exterior disconnect switches located next to meter for each inverter 1,788.00 1,788.00 Design Approved <br /> PCO 18 Induction units at 202&207 8118109 Splitting one unit into two will allow ceiling heights to remain as shown in drawings 9,238.00 0.00 Design Re'ect <br /> CE#21 Added baby changing station 8110109 Plans call for'"B Ownerr'.Asked GC for pfice to keep consistent with other(2), 285.00 285,00 Scope Approved,91: <br /> E#22 Disconnect switches at chiller 9116109 Specified chiller was submitted with single point connection,chiller on site has two point connection 1,000.00 0.00 GC €e ect <br /> CE#23 Relocation of FA Cabinet,Bull station,&strobe 8112109 Deeded to be done to clear the donor walls ace.T M 500.00 674.00 Upgrade Approved I <br /> PCO 19 Provide wiring for hand driers in bathrooms. 8120109 Requested by Town to upgrade from hard towels to driers, 1,500,00 4,568.00 U pq rade Approved 1 <br /> ---------- <br /> Parnroy Associates-Most Recent Report 12-31-09 <br />