My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/9/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
6/9/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:14:39 PM
Creation date
5/9/2018 2:47:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/09/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
they could view the automatic temperature control system from them'respective offices and any <br /> further adjustments could be made with Brad remotely. It was agreed to tale-the system off the <br /> 24/7 occupied mode'and return it to regular operation. World Wide installed the charcoal <br /> canisters and all agreed to see hove the building was on Monday morning. <br /> • 6/7/10, :ooam—Bufftree met with Brad Tripp to review status of building.The equipment was - <br /> operating correctly and humidity level was fine.The smell appeared to have lessened. Bufftree <br /> performed an above the ceiling inspection in further attempts to locate the original of the smell. <br /> No findings. <br /> • 7/10, 1 :o am—PA met with Buffiree to review the status of the building and the planned <br /> repairs to the areas damaged by the leak. PA did not notice an improvement in the smell and <br /> directed Bufftree to implement the next rneasur%^--to C. rrel-t the problem. Bufftree gill discuss <br /> the next steps with both World Wide and DDS. <br /> 0 6/8/10, :ooarn—Bufftree reports that the de-ionization units will be installed in the building on <br /> the night of 6/8/10 and will be allowed to run all night in the building. PA, Bufftre and <br /> Worldwide will meet at Tarn on 6/9/10 to shut down the units and access the building. De- <br /> ionization units are ozone generating units which convert 02 to oB for a short period of time. <br /> When in the oB state the 03 bonds with all carbon molecules(the smell).The 03 then dissipates <br /> and so with it the carbon molecules. Worldwide is installing (1) large unit and (4) small units <br /> which will cover the entire building. The HVAC system will be run on circulation mode during <br /> this process with no exterior air introduced into the building and no exhaust air emitted from <br /> the building. <br /> • 10, 7: oam—PA, Bufftree, Brad Tripp, and Worldwide met onsite to shut down the de- <br /> ionization units. The HVAC system was returned to normal operating rode which is 100%fresh <br /> air introduced and 100%exhaust air expelled.This gage B hours of air' it ulati n before opening <br /> for business at Loam. world wide has explained that the units should not be running a <br /> minimum of 2 hours before the building is opened for business. By doing this at Tarn vire met this <br /> requirement by 150%. The smell had lessened overnight, but a faint smell was still detectable. <br /> Brad Tripp will report on the smell over the course of the day. Bufftree will return to the <br /> building tomorrow morning to re-assess and discuss with Ma hpee if further action is needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.