Laserfiche WebLink
MASHPEE ARCHIVES <br /> PROJECT BUDGET <br /> Engineering/Design $20,000 <br /> -1 %construction costs (industry standard) <br /> HVA /Climate Control .$35,000 <br /> Boiler replacement (Item 1, MECH, Capital Needs Assessment) $5pOOO <br /> New HVAC Email dated 10-27-.10) $30,000 <br /> Window Replacement $5,000 <br /> Window w replacement (Item B, ENV, Capital Needs Assessment) $5..400 <br /> Sprinkler/Fire Alarm System $25,000 <br /> Fire alarm upgrade (stern 6, ELEC, Capital Needs Assessment) $10,000 <br /> Sprinkler r installation (Email dated 10-28-10) $16,000 <br /> Basement Waterproofing/Roof Drainage Repair $200,000 <br /> Roof downspouts (Item 7, ARCH, Capital Needs Assessment) $3,000 <br /> Waterproof basement (item 8, ARCH, Capital Needs Assessment) $1,500 <br /> Mold remediation ( 9.. ARCH, Capital Needs Assessment) $5,000 <br /> Bulkhead roof (Item 4, ENV, Capital Needs.Assessment) 10't000 <br /> Electrical Upgrade $20.,000 <br /> Service upgrade (Iters 1, ELEC, Capital Needs Assessment)ent) $5,000 <br /> Interior lighting replacement (Item 2, ELEC Capital Needs Asses) $8.'000 <br /> Emergency lighting (item 3, ELEC, Capital Needs Assessment) $2,000 <br /> Receptacle installation (Item 5, ELEC, Capital Needs Assessment) $2,00.0 <br /> Archival Storage/Display Units $25,000 <br /> Structural/Accessibility Improvements $50,000 <br /> Accessible entrance (item 1, ARCH, Capital Needs Assessment) $12,000 <br /> Accessible bathroom (Item 3,. ARCH, Capital Needs Assessment) $x.7,500 <br /> Stairway replacement (Item 11, ARCH, Capital Needs Assessment) $1.0,000 <br /> 1'#floor structural improvements (estimate, including analysis) $10,000 � <br /> TOTAL $200,000 <br />