My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/21/2011 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
7/21/2011 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:01:39 PM
Creation date
5/9/2018 2:50:44 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Torn Buildi.n Solar <br /> High/Middle School <br /> Pre-construction meeting held 7-7-11 with Borrego Sol'ar, D&U Electrical Contractors, LTM <br /> Builders (roof), School officials <br /> Work began July 1 <br /> Contract awarded ed to Corolla Roofing for$78,084 to strip in new seams on roofs where panels <br /> proposed <br /> -year old roof; <br /> • 1 -year roof warranty expired in 2006; <br /> 0 n leas currently, bit evidence 1 f some �U C seams; <br /> 0 per agreement with Borrego Solar, penalty for loss of electrical production if roof needs <br /> repair during first 6 years of operation; <br /> 0 per agreement with Borrego Solar, Town re ponsible,for cost of removal of solar panels <br /> to accommodate roof repair; <br /> • Corolla to provide S year warranty; <br /> life expectancy of roof to be extended by 10-15 years <br /> Roof work began July 19 so no delay in solar installation <br /> Application filed Frith INSTAR t Schedule-electrical shutdown as required after panel installation <br /> (around 8-12-11) <br /> Project on schedule for completion b 8-26-11 <br /> Town Hall <br /> Sample of roof joists taken to test capacity of roof for additional structural Coad from panels <br /> Results expected by 7-22-11 <br /> If.negative results, Borrego to increase system size at Senior Center <br /> If positive results, design to be completed (per warranty requirements of neer Firestone roof) <br /> Senior Center <br /> Under design <br /> Green Communities Pro' is— FIVAC <br /> MP — Boiler Replacement <br /> I CC—AHU Replacement <br /> Contract signed with Mercury Mechanical (MM) <br /> Submittals reviewed/approved by GGD <br /> Coordination meeting held' ith Corolla Roofing for KCC project (one roof-top AHU in cafeteria); <br /> Corolla to Contract with MM for duct replacement (in Corolla's scope ofwork) <br /> Project on schedule for completion by 8-26-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.