My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/22/2012 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
5/22/2012 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:13:18 PM
Creation date
5/9/2018 2:54:49 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
05/22/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
New Business(continued) <br /> Concession Building KC-CoombsLQuashnet Schools <br /> Catherine said the proposed build'Ing <br /> is to replace the concession building that bumed down last summer. <br /> Will tie septic to septic system at KC Coombs School. <br /> Town received some insurance money--about$22,000—any additional money for the new <br /> building would have to be funded by Pop warner. <br /> Final agreement reached with pop warner. If they have contractors who are willing.to donate <br /> their time then Town would purchase the materials but Town must first be given copies of their <br /> insurances; licenses; etc. in writing. <br /> If it doesn't materialize,then would just replace what was there-y-nat,nely a simple concession stand,no <br /> bathrooms,etc. <br /> Catherine showed PCC the proposed Plans. PCC c mmented that the flans need more information—for <br /> example: where's venting for stove; door sizes;smoke alarm;code review-etc. <br /> Catherine said she is concerned that even with volunteers the cost of tiiaterials will exceed$22,000. PCC <br /> agreed pointing out that materials such as electric panels,piping,electrical work are all expensive items. <br /> Discussion <br /> ��/i1M�Fi�Yrt <br /> Storage shed funding was approved to be built at Som Cape Beach. Beach scheduled to open June 23d. <br /> It is a simple storage shed—no electric. <br /> Catherine,said at next meeting PCC will be looping to approve items that ceding was approved at last <br /> Town Meeting. <br /> Next Mee n ... : o p.m. on Wednesday, ,lune 20,2012, <br /> i <br /> Adjournment <br /> Eugene Sm rg n motioned the meeting be adjourned;Irving Goldberg-seconded the motion;and it was <br /> unanimously passed. The meeting adjourned at 6:35 p.m. <br /> R.epectfullr submitted, <br /> J Giliber <br /> cording Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.