Laserfiche WebLink
Mashpee Planning and Construction Committee <br /> Minutes of Meeting.Held Wednesday,June 20,2012 <br /> Town Hall Meeting Room <br /> Committee Members Present: Steve Cook,Irving Goldberg,-and Joe Brait. <br /> Absent: Eugene Smargon. <br /> Also Present: Catherine Laurent,DPW <br /> Chairman Steve-Cook called the meeting to order at 6:40 p.m. <br /> Approval of Minutes <br /> .doe Brait motioned to accept the minutes of the Meeting of May 22,2012 as written; Irving Goldberg <br /> seconded the motion. <br /> Vote: 3 Yes. <br /> Steve Cook,yes. Irving Goldberg,yes. <br /> Jae Breit,yes. <br /> Old Business <br /> Catherine Laurent provided update on the archives project sabring that we only got a single bid in the <br /> amount of$234,453 and with additional alternates vire added we would be a little over budget but we are <br /> still waiting to Bear from National Grid and Cape dight Comp' act on what incentives and rebates they may <br /> pay for the efficiency improvements we would be doing. <br /> Alternate 45 for re-building the exterior stair for the back of the building and the roof over the basement <br /> would have to be done and we are looking for DPW or Sherlff s Department to do which would eliminate <br /> the$19,600 expense but there would be cost for materials. <br /> Catherine said the engineer is going to run the numbers for the HVAC electric system. With the HVAC <br /> electric system,difference is lower installation cost but higher running cost. However, smee the building <br /> is closed for most of the heating season the running cost might not be significant at all when compared to <br /> the higher installation cost of another system. <br /> The Committee discussed in-depth whether or not to proceed with renovations-in view of the fact that <br /> only one bid was received plus costs involved as opposed to re-building a Simple building with simple <br /> HVAC system, sprinkler system, and electric baseboard. Steve Cook estimated to re-build is <br /> approximately$250 per square foot for a very simple buiRding. <br /> 4 <br /> Catherine said we have 2 months to make the deei ion whether to accept or decline the bid. The feeling <br /> of the Committee members was in that time the Committee could work on getting some rough numbers to <br /> discuss at next PCC meeting...keeping in mind that with a new building approach there would b <br /> demolition costs-,engineer/architect co is;bid process;etc. <br /> Consensus of the Committee was to do the research anflook at other options. <br /> Motion; Irving Goldberg motioned to table the archives project to research other options; Joe gait <br /> seconded this notion. <br /> Vote: 3 Yes. <br /> Steve Cook,yes. Irving Goldberg,yes. <br /> Joe Brait,yes. <br />