My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/19/2012 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
7/19/2012 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:01:23 PM
Creation date
5/9/2018 2:55:18 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/19/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Planning and Construction Committee <br /> Minutes of Meeting Held Thursday,July 19,2012 <br /> Town Hall Meeting Room 3 <br /> 4 <br /> Committee Me bers Present: Irving Goldberg,Eugene Smargon, and Joe Brait. <br /> Absent: Steve Cook. <br /> Also Present: Catherine Laurent,DPW <br /> Vice Chairman Irving Goldberg called the meeting to order at 6:30 p.m. i <br /> Averoval of Minutes <br /> Joe Krait motioned to accept the minutes of the.Meeting of June 205 2012 as written;Irving Goldberg <br /> seconded the motion. <br /> Vote: 2 Yes; 1 Abstain. <br /> Irving Goldberg,yes. Eugene Sargon,abstain. <br /> Joe Krait,yes. <br /> old'Business <br /> Catherine Laurent said she put together costs of renovating the Archives Building, as well as estimated <br /> new construction costs. A copy of the renovation and new construction estimates provided by Catherine <br /> are attached to the printed set of these minutes. <br /> Catherine pointed out that under renovation costs wherever DPW or Sheriff s Department would do work <br /> the price quote was just for materials. Also,the renovation construction bid of$234,453 is with'electric <br /> heating. Switching to gas would cost another$70,000. <br /> Iry pointed out that design fee is not listed in the estimated cost figu-res;Catherine will add this. Also, <br /> Catherine said we would need a Clerk, not a project manager. <br /> Bridget money for Archives project of$240,000 carne from CPA. Road bond paid for the parking lot <br /> project. <br /> Benefits of doing new construction; <br /> • Able to relocate building on the site;or even not tied to that site if there is someplace else more <br /> desirable within Town. <br /> • Single story building can be built. <br /> • No need for ramp 0,000 cost). <br /> Joe Bruit noted that a brand new building will be more efficient. <br /> • Iry Goldberg said a new building gets Town more value out of the money spent. <br /> Catherine said in estimating new construction cost, she is using 1500 square feet of building. Iry agreed <br /> with this approach since this is a one-story building. Both Joe Brwait and Iry Goldberg felt 1500 square <br /> foot building could come in better than $200 per square feet cost. <br /> Catherine said she spore with Joyce Mason and with the Historical Commission. They are in favor of <br /> pursuing other options. <br />
The URL can be used to link to this page
Your browser does not support the video tag.