My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/19/2012 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
7/19/2012 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:01:23 PM
Creation date
5/9/2018 2:55:18 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/19/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Archives <br /> Renovation <br /> 2000 square feet,two story. <br /> ±year old building <br /> Construction Bid $234,458 <br /> -Demolition (interior, by DPW) $1,000 <br /> Water Main Installation (fire Suppression) $10,000 <br /> Exterior Stair Construction (bar DPW) $2,500 <br /> Basement Roof Construction (by DPW) $5.,000 <br /> Carpet Installation (bar DPW) $3.,000 <br /> Front Walkway Construction $2,,500 <br /> Ramp $30,pOOO <br /> $288,458 <br /> New Construction <br /> Relocate n sits, single story <br /> Average Commercial Costs <br /> $2F $25 /SF <br /> 1,500 square foot $300..000t <br /> 2,000 square foot $400,00 $5 , o <br /> Construction $37,5,000 <br /> Demolition $15,000 <br /> Water Main Installation (fire suppressions $10,000 <br /> $400,000 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.