My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/3/2018 AFFORDABLE HOUSING Minutes
>
4/3/2018 AFFORDABLE HOUSING Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 5:00:15 PM
Creation date
6/11/2018 11:46:22 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
AFFORDABLE HOUSING
Meeting Document Type
Minutes
Meeting Date
04/03/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Affordable Housing Committee <br /> Meeting Minutes <br /> April 3, 2018 at 6:30 pm <br /> Mashpee Town Hall <br /> Approved 518118 <br /> Present: Chairman Allan Isbitz, Walter Abbott,Berkeley Johnson,Bruce Willard, Marie Stone <br /> Also Present: Wayne Taylor-Assistant Town Manager <br /> CALL TO ORDER <br /> Chairman Isbitz opened the meeting at 6:30 p.m. with a quorum, and the roll was called. <br /> APPROVAL OF MINUTES February 6,201.7 <br /> MOTION: Mr. Willard made a motion to accept the minutes of February 61. Ms. Stone <br /> seconded the motion. All voted unanimously. <br /> OLD BUSINESS <br /> 950 Falmouth Road Feasibility Study-Brian Kuchar, of Horsley Witten, was present to <br /> discuss the results of the Development Feasibility Study for 950 Falmouth Road which consists <br /> of three Town-owned parcels. Mr. Kuchar distributed an agenda for his presentation. Mr. <br /> Kuchar explained that the Preliminary Study was completed in 2016, to determine if the site <br /> should be considered for potential affordable housing development. It was then determined that <br /> the site warranted an advancement of the site design. <br /> In the current phase 2 study four concepts of housing, including a single large apartment <br /> building, were initially considered but it had since been narrowed down to two concepts, in <br /> consultation with Town officials and representatives. Mr. Kuchar referenced the Red Brook <br /> stream,which, following a study,was determined to be an intermittent stream, and allowed for <br /> the removal of the 200 foot river setback requirement. The Town agreed with the findings that <br /> the stream was intermittent, The two development concepts were reworked because the findings <br /> regarding the stream created additional space. <br /> Mr. Kuchar, however, cautioned that the wastewater flows still remained as a limiting factor. <br /> The study originally identified a wastewater flow of 6,950 gallons per day (gpd)., However, <br /> using an allowable legal definition of an acre as 40,000 square feet, the maximum permissible <br /> waterwater flow calculation was revised upward to 7,600 gpd. Building concepts were advanced <br /> after being discussed townwide with the Town Planner, Conservation Commission, Board of <br /> Health, and the Affordable Housing Committee, <br /> The Chair inquired whether additional bedrooms could be incorporated, due to these changes. <br /> Mr. Kuchar noted that the flow increase would permit six more bedrooms. Mr. Kuchar stated that <br /> the increased space due to the removal of the river front setback had the biggest impact on the <br /> number of bedrooms permitted, , but cautioned that it was still a balancing act between <br /> wastewater flow and the number of units that could fit in the space, in addition to parking <br /> requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.