Laserfiche WebLink
a <br /> f <br /> DNR D ii e4ton shellfish constable Report: Brian Everett tett state d that there were no issues with the <br /> shellfish program in spite of the intense cold wave. Ric . . <br /> k noted the frigid temperatures have no effect on <br /> the oyster beds. <br /> Citteee : <br /> Mash ee Hilae and. hn''s Pond—See Harbormaster report <br /> on s . See Harbormaster report. <br /> waguo it RaSee Harbormaster report. <br /> water uaiit <br /> ­Update/Water dem !in � <br /> e o Don MacDonald stated there was nothingto report <br /> and update on. p <br /> �arnsta le o <br /> unty Rewu rces CoMittee U <br /> date—No report. <br /> Sewer Conn mitt <br /> ee Re ort- No Report <br /> pubic Access l date dendated on the Great eat River Ramp Project. He said the heating hoses were <br /> off and the first load of rock protection was delivered on the ` <br /> so uthsid e# another lea d will follow today <br /> on the northside. The pulling of the coffer da to <br /> � is estimated to occur on �� . <br /> waters s irn rovee rpt Plan and Dredgin n Schedule.. Ken announced the Town had gone forth and <br /> signed the County Dredge Contract that previously was in question. <br /> Ken reported the contract was <br /> signed on terms agreeable to the Town. The newly <br /> f y constructed. Barnstable bounty dredge unit is on <br /> site and it's first deployment will be at Pop ponesset Bay. work <br /> y will begin this month on Peppy channel <br /> and be completed by February Ist, Ken also noted there is no conflict with bird co11e!'vation issues at <br /> than location. <br /> Ken reported that the discussion on thero osal b rt <br /> R p y Save the Bay #o deposit trig cked i n",sa sand on <br /> the Spit, utilizing the existing Town permit, has been deferred due to another rescheduled meeting. It <br /> will be addressed at a later date. <br /> New Business :_lien announced that he was advised that the dredge of the great lever and the chole <br /> point channel leading out to Wa uoit Ra could • <br /> Y not happen this year. The County Dredge service wl ll <br /> not undertake this request.This news was not received with <br /> acceptance by several members. <br /> Alec Turner repeated his concerns on the ' ' • <br /> rising danger that the narrowing channel posed to lame <br /> vessels that night not be able to negotiate egress, It's estimated <br /> that 250 cubic yards needs to be <br /> removed to avert the immediate Fisk.. The possibilityof collision a soon he said is of paramount concern; <br />_ Steve done said that he has complained for <br /> p years about the lacy of an established dredging pian for <br /> waquoit Ray and its waters. He emphasized that a long-terralan i <br /> p s needed like the routine dredging <br /> schedule established for Pop ponesset Bay. <br /> y <br />